How is Balakovo preparing for the heating season 2015?
Preparation of Balakovo for the first colds is marked by a series of major repairs. The main news of the city was the reconstruction and replacement of the heating main in the area of the bridge under construction. According to Vladimir Popeko, Deputy Housing Administration, active work is currently underway to dismantle obsolete parts of the pipes and replace them completely. All the necessary quantity of building materials was purchased, the construction team was completed, and the repair process was carried out for all planned volumes.
Another important point in the preparation for the new heating season was the careful monitoring of Balakovo's equipment and boiler plants. The city's economic department prepares final accounts, which shows the level of fitness of the central network for the winter of 2015-2016.
An important role in the run-up to the heating season is working with debtors.
What does the heat supply schedule depend on?
The timing of the inclusion of heating systems in Balakovo depends on a number of conditions, the main of which are:
- availability of funds for timely start of heating;
- compliance with the timing of repair and maintenance work with the system.
Today, 89% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.
Priority of heating supply in Balakovo
Traditionally, social institutions will receive the first heat:
- kindergartens;
- educational institutions( schools, colleges);
- hospital;
- of the state institution.
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
Optimal temperature in a residential area
If you have doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius temperature optimum | acceptable |
Dwellings | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
18-26 | ||
18-26 | 16-20 | |
16-20 | 16-20 | |
16-18 | 14-20 | |
Storage pits | 16-18 | 12-22 |
What to do, if heating is not given
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), the heating fee will decrease by 0.15%.