greenhouse erected from the pipe 25x25 or greater on a flat surface with no closely spaced groundwater. As a foundation, wooden blocks or bricks are used. The latter is laid in 1-2 layers, depending on the size of the structure. In order to determine which pipes are more suitable, you must first make a detailed plan. The developed documentation allows you to calculate the number of necessary construction tools.
-
- determines the necessary pipe diameter greenhouses
- Erect a greenhouse of the tubes with his hands
- Recommended pipe arcs greenhouse
- Ready greenhouse from round tubes: performance
- Arched greenhouses of pipe 25x25( video)
- Examples of greenhouses pipe( photo ideas)
determines the necessary pipe diameter greenhouses
Erection garden structures based on circular arcs requires mandatory preliminaryStudy of the project. A calculator and a personal computer will help. The program introduces the length and width of the structure, the number of windows, the size of the door and so on.
It is necessary to take into account the localization of sewer pipes, otherwise plumbing problems will require an unscheduled digging of the greenhouse.
It is not superfluous to fix the position of the irrigation tube on the plan. Regardless of whether it is planned to make it manual or automatic, you need to allocate a place in advance for the delivery of water.
Subsequently should adhere to the following operating procedures:
- If the greenhouse is large, the openings for watering mechanism construct withTwo sides;
- When orienting along the line west-east, it is necessary to abandon the square window, otherwise there will be no significant loss of heat;
- For the water pipe, a separate place is allocated in the far corner, so that all kinds of repairs do not lead to a violation of the integrity of the object.
The calculation is carried out at the stage of drawing up the drawing. Regardless of the size of the greenhouse with an unclosed structure of the base, use at least 10-15 points of attachment of the film to the main frame.
Erect a hotbed of pipes with his hands
Depending on the depth of groundwater, it is necessary to do the foundation. The closer they are to the surface, the thicker the layer of bricks. In the case when the water table is at a low enough level, only an ordinary board is needed.
It is cut into 7-9 equal parts, of which a similarity of foundation is made. In the language of builders, this is called framing the frame.
During this process, you need to constantly use the building level, ensuring the correct geometry of the frame. Once the resulting base of wood has passed all the measurements, it is fixed using metal fittings.
further procedure is as follows :
- Depending on the structure mass is taken pipe 25x25 or40x20;
- The pipe is cut into four equal parts;
- The result of cutting will be 36-40 pieces of reinforcement;
- The length of each piece is 60 cm, of which 40 cm is underground;
- The recommended interval between reinforcement is 60 cm;
- Over the fixed elements of the construction pipes are mounted;
- Arches are installed at a distance of 50 cm to 2 m from each other;
- Avoiding sagging design will help mathematically accurately correlate the height and width of the greenhouse.
Accuracy and pedantry are not only courtesy of kings, but also a guarantee of continued operation of the garden structure. After buying metal pipes, they undergo a detailed inspection. Only in the absence of visible defects, they are cut and subsequently installed.
Recommended pipe arcs Greenhouse
As mentioned earlier, the basis of the whole structure is a framework that is based on the arch elements. If they are too close, this will weaken the structure. Even a small gust of wind will destroy it to the ground.
Do not allow self-made arched constructions to be too far away. This provokes excessive sagging.
As soon as the issue with the supports is solved, it is necessary to pay attention to the end structures. In the manufacturing process, you must constantly keep in mind the desired strength of the frame of a greenhouse made of polycarbonate.
further procedure is as follows:
- The end of each tube should be fixed to drive a fixture;
- Fix the construction on a wooden frame;
- Before the collection of the door structure begins, you need to make sure of the correctness of all dimensions;
- As the main material of the door is an untreated bar;
- Fix it better on the basis of bolts, rather than an attached mechanism;
- To ensure the required degree of rigidity, a fixed obliquity on the outside of the rake door will help;
- Installation of the door unit in the opening;
- The steel hinge and handle are installed only after the protective film is applied;
- To PVC pipes are not damaged during the installation process, all the work is carried out at a temperature of not lower than + 18C.
The diameter of the pipe is largely determined by the operating characteristics of the greenhouse. For example, the section 20x20 is suitable for moderate climate and seasonal nature of the structure. In the event that the gardener plans to spend more time at the dacha, attention should be paid to the pipe bender 40x20.It is strongly recommended to check the design with each stage of installation of flexible aluminum or PVC pipes.
Ready hothouse of round tubes: performance
Once greenhouse installation process is complete, it should be examined carefully. First, make sure that there are no welded seams, otherwise the strength of the structure will leave much to be desired. This is explained by the fact that under the influence of external factors, all the seams wear out. As a result, rigid elements lose their strength. After that, all attention is switched to the input group.
Increase the duration of the door of the greenhouse will help bolt-on fastening. From other options it is better to be due to two circumstances.
Classic hinged mechanism should be changed in a year, and all kinds of hooks are subject to the adverse effects of moisture.
Do not forget that windows and door panels may eventually sag. Avoid this development of events helps bolt mount option.
Among the other elements of the construction, which are compulsory in nature, the following are distinguished:
- The quality of the adhesion of polycarbonate sheets to the surface;
- The choice in favor of mounting tapes makes it possible to minimize the possibility of damage to the honeycomb structure during installation;
- The presence of reinforcing braces, located in the end part;
- The presence of lateral strength enhancers localized in the middle part of the greenhouse.
Arched greenhouses of 25x25 tube( video)
The self-made greenhouse makes it possible to kill two birds with one stone. Firstly, the project fully meets the needs of the gardener. You do not need to waste time on finalizing the finished version. Secondly, there is a chance to cut costs. All materials are selected taking into account the climatic features of the region, the characteristics of crops and the duration of use of the structure.