Stairs made of concrete by their own hands, instruction and manufacturing technology

click fraud protection

In this article we will thoroughly study the process of manufacturing a concrete ladder with our own hands. It is worth noting that the concrete staircase with its technology resembles the construction of a concrete porch, the construction of which we disassembled in the previous article, but as an additional material we will analyze the step-by-step construction of the staircase - so let's proceed.

Concrete stairs with own hands

Concrete stairs with their own hands

The cycle of construction work associated with the construction of the stairs must begin with the calculation of the number of steps you need to know the height between the floors between which the staircase will be located, then this height will be divided by the expected number of steps that we want to get. It should be noted that the height of onestep should be about 150-170 mm, this will allow us not to seed on the steps and vice versa, if the step height is higher, climbing to the second floor will be very problematic, especially inour case, because we do not have very long steps. As for the width of the staircase, it will depend directly on the distance between the walls where the staircase will need to be inscribed if space is limited to a ladder with stall steps being built.

A staircase with runners is a variant of a ladder, when there is no opening between the two platforms, and this space is filled with steps.

The figure shows the optimum step height

The figure shows the optimum height of the

step. Step 1 - installation of the

ladder formwork The first thing we need to do is to set up the ladder frame. The frame serves as a support material for our entire monotonous concrete structure at this stage, note that the boards on our formwork need thick and very strong, especially if you make a massive ladder, because they will keep our entire structure after casting concrete.

Installation of formwork for pouring concrete

Installation of the formwork for pouring concrete

Next, we set up the overlap of the formwork in the openings between the steps. Note that the formwork for the steps must also be anchored and strengthened as best as possible - this is to ensure that our frame is not deformed after pouring concrete,the staircase will go to smarku. Mount the formwork best with metal corners, such as you see in the picture.

Metal angles for fastening formwork

Metal mounting brackets for

Sample fastening for steps

formwork. Sample attachment for

steps. Note that the side plates of plywood must also be fastened or supported by additional reinforcing constructions. In our case, the sideboards hold the wooden scaffoldings.

formwork Step 2 - laying of the metal frame

At the bottom of our frame it is necessary to lay a metal reinforced frame - this will serve as an excellent element that will give strength to our design.

The reinforcement frame is tied together by means of ordinary wire

The reinforcing casing is tied together with a conventional

wire. Note that the cells between the elements should be of the order of 200 mm, and sometimes more than that is enough.

Reinforcing framework for concrete stairs

Reinforcing frame for a concrete ladder

For a metal frame metal bars with a diameter of about 15 mm are used, the yarns rest against the holes in the wall, and from the other end they are made almost to the end and rest against the formwork.

Special attention should be paid to strengthening the very first stage - because it will be sent to the largest load after pouring.

Step 3 - pouring the ladder

Fill the stairs, we advise you to start with the first stage, this is especially true if the concrete, how to choose the concrete read here, is done in liquid form.

Filling of the first and second stages

Filling of the first and second stages of

By the way, because we laid a metal frame at the bottom of the stairs when filling the stairs, it is necessary to shake the concrete mixture with a conventional trowel, it will not allow air layers to appear in the structure and will not undermine the monolithic structure.

By the way, the best option is the vibration of the concrete - only in this way you will get rid of all the air strikes and achieve a single solidity when pouring.

It is necessary to remove the formwork approximately 10 days after pouring, and the supporting poles that hold our frame are recommended to be removed after 14 days. Then there is a process of grinding concrete with a grinder and the staircase gets an attractive appearance, and how do you build your ladder?details in the commentary.