When will heating in Nalchik in 2015

How does Nalchik prepare for the heating season 2015?

Residents of the city do not cease to ask the question: "When will they turn on heating in Nalchik?" Soon it will be cold in the street, and public utilities still have not completed the repair of heating mains in the streets of the city. In the local administration of Nalchik, they say that management companies are doing everything possible to ensure that the heating season in the city began on time.

Nalchik is waiting for the beginning of the heating season

To date, the completion of the thermal route to the hostel, located on Krylova Street. The supply of hot water for many apartment buildings on Gagarin Street has been restored. In more than 40 houses, thermal inputs were replaced, and 18 houses were pleased with the replacement of sewerage and cold water supply.

When heating in Nalchik, all houses. And also objects of a social infrastructure should have passports of readiness. Only in this case they will learn the heat. The level of preparation of municipal facilities by city facilities is about 90%.

In Nalchik, a commission was created to eliminate emergency situations on heating mains

Utilities must also complete the crimping and flushing of heating systems located within the residential buildings. These works have already been completed in 240 houses out of 280 planned. The critical date for the fulfillment of obligations by the management companies is the end of September. All works will be completed by October, when they should give heating in 2015, while warmth starts to flow into social institutions.

In kindergartens, hospitals and schools begin to include heating

What does the heat supply schedule depend on?

The timing of the inclusion of heating systems in Nalchik depends on a number of conditions, the main of which are:

  • availability of funds for the timely start of heating;
  • compliance with the timing of repair and maintenance work with the system.

The city administration of Nalchik allocated enough funds for repairs and maintenance of heating systems in 2015, so the repair work will be completed on time.

Today 90% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.

Priority of heating supply in Nalchik

Traditionally, the first institutions of heat will receive social institutions:

  • schools;
  • medical institutions;
  • children's homes;
  • kindergartens.

After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.

The optimum temperature in a residential building

If you have any doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:

Room Celsius temperature
optimum acceptable
Living spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Driveway, staircase 16-18 14-20
Pantry 16-18 12-22

What to do if the heating was not given to

Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.

By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).

If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.

instagram viewer