How does Novorossiysk prepare for the heating season 2015?
When will they switch on heating in Novorossiysk? This issue will never lose its relevance, especially not far off the cold. People are starting to buy radiators, because no one knows when to give heating in 2015.Usually the heating season in Novorossiysk comes in the middle of October. By this time, all management organizations must finish repair of heating mains, boiler houses of the city.
When heating is provided in Novorossiysk, absolutely all institutions must have passports of readiness. At this stage, the repair work is in full swing. The restoration of heat resources in Novorossiysk boiler houses has been completed and is now being tested for efficiency. Everyone is checked with the utmost care to avoid further emergencies. On the thermal mains during the summer the rotten elements were replaced.
Socially important institutions are fully prepared for the heating season 2015-2016.They will receive heat at the end of September. Most of the houses received a passport of readiness. In some houses repair works are continued on pressing and flushing of heating systems.
What does the heat transfer schedule depend on?
The timing of the inclusion of heating systems in Novorossiysk depends on a number of conditions, the main of which are:
- availability of funds for timely start of heating;
- compliance with the timing of repair and maintenance work with the system.
The city administration of Novorossiysk allocated enough money in 2015 to repair and service heating systems to cope in time.
Today, 95% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.
Priority of heating in Novorossiysk
Traditionally, the first institutions of heat will receive social institutions:
- schools;
- kindergartens;
- health facilities;
- children's homes.
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
Optimal temperature in a residential building
If you have doubts about the quality of housing services in heating systems, make a temperature measurement in the apartment's premises. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius Temperature | |
Optimal | Tolerable | |
Dwellings | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
Bathroom | 24-26 | 18-26 |
Corridor | 18-20 | 16-22 |
Driveway, ladder | 16-18 | 14-20 |
Storage pits | 16-18 | 12-22 |
What?do if heating is not given
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide the service( the total amount for the entire period), the heating fee will decrease by 0.15%.