Sewer in the bathroom - much easier than it seems

click fraud protection

Use of plastic sewer pipes

The application for the installation of plastic sewer pipes helps to solve several problems simultaneously. First, the light weight of such pipes allows them to be used anywhere and at any height. In addition, this material does not require welding, for which special equipment and skills are needed. So, what are the advantages of this material:

  • About 50 years of high-quality service;
  • Virtually not clogged due to corrosion and various deposits;
  • Relative simplicity of installation works;
  • Huge selection of connections and adapters.

Important! Before the beginning of installation work it is necessary to make a qualitative estimate for the building material, which will help to avoid busting it.

Sewer planning is the key to the success of

repair work. In order for the installation process to be of the highest quality and quality, it is necessary to plan the bathroom, where the exact dimensions of the room will be indicated. In this plan, mark the future system, which will allow you to determine the amount of material and various connections. In the planning process, you should pay maximum attention to the choice of pipe diameters and their future tilt angle. The slope is required for a high-quality discharge of water into the sewer.

Important! The angle of slope of pipes should be chosen such that it will allow to drain all the water from the system, which will prevent clogging of the sewerage. The diameter of the sewer pipes is chosen according to a certain standard, but in some cases it is possible to deviate from the building norms, but this is only relevant in certain cases provided for in the construction and repair process.

Sewer in the bathroom: quite simple installation

After the planning works are finished, and all the necessary material is purchased, you can proceed with the installation work. The plastic pipes are initially ready for use. At each end of the pipe there is a special chamfer, which is necessary for the elements to be connected.

In case of cutting it is necessary to remove this chamfer yourself, so that the cut piece does not crush the rubber gasket-sealant. After connecting all the pipe elements, the sewage system can be tested.

Important! On the cut off areas there should be no burrs capable of disrupting the work of the seals.

So, the installation process is as follows:

  1. Preparation of the work plan and the required material;
  2. Fit all the elements to the desired size;
  3. Installation of each individual system element and verification of system operability.

For more detailed acquaintance with the installation process, you can view the special material related to the category of "sewer in the bathroom, video."As a rule, such videos show the process of docking, pruning and checking the entire sewage system.

For the installation of this system no special construction tool is required, as the pipes are easily cut with a simple hacksaw for metal.

instagram viewer