In this lesson we will consider the construction of a swimming pool on the site with our own hands, it should be noted that it is not such a difficult task to improve your site, it all depends on how much you are willing to experiment with finishing and giving your pool visibility and completeness.
Materials that will be required for the construction of the pool:
- Thread - to draw a contour of the structure.
- Shovels - in order to dig a hole under the pool.
- Several concrete tiles - for laying on the ground.
- Sand - for compacting.
- Stones - for giving a beautiful appearance.
- Tarpaulin - for laying on the bottom of the pool.
- Crushed - for laying on the bottom.
- Pump - for creating the image of the Alpine hill.
Step 1 - Make the outline of our pool
The area of our pool is measured with a thread that is attached to the contour in wooden posts, the shape of the pool can be created any we chose in the form of an oval shape with slightly wrapped edges.
Step 2 - Dig a hole for the pool
You can dig a hole using a conventional shovel This step takes an average of 1-3 hours and depends on the number of people who will dig your pool,we coped very quickly.
Step 3 - We finish with digging holes under the pool
Note that at this step we lay a hill of land that will later serve as a construction for the waterfall that we will install with the poolon our dacha site.
Step 4 - We bring the pipes under the pool
At this step we will need to sprinkle the pool with sand and bring the pipes that will allow us to organize a waterfall in our dacha section. It is installed very simply and works through a pump, which in turn operates on electricity. The pump will pump water from the pool and lift it to our hill and work according to this cycle.
Step 5 - We lay polystyrene and rubber
to the bottom of the pit. Step 6 - We are laying the pool with the stone
Preparing the stones is probably the most difficult stage of all our work. A stone of suitable length can be very difficult to find. A good option would be to go to the riverbank and collect stones there, but there basically is pebbles, but it's your choice. If you do not know where to find the stones, then we advise you to purchase them in special construction stores.
Preliminary leveling a pile of earth, we proceed to the laying of stones, but everything depends on your imagination.
This will look like our pool after laying out the stones, now proceed to the next stage - it is a mound of rubble on the bottom of the pool( for rubber).
After the crushed stone is filled with water. Please note that the stone should be thoroughly washed so that your pool does not become dirty after filling.
Step 7 - Connecting the pump to the alpine hill
As our unit from which the water will pour - we have chosen an ordinary jug, you will agree - this gives a certain zest to our dacha pool.
The pool with the Alpine hill is ready, it remains only to plant a small botanical garden around it, but this is another story about which we will share with you from the next lessons from Stroy-shkola.ru. If you have any questions, ask them in the comments.