Kitchen Installation: How to install the kitchen right?


Assembly and installation of the kitchen - a process responsible, meticulous, but not particularly complex. Here the main thing carefully prepared: sound planning, to sum communication and complete the repairs. When the field of action is ready, you can proceed directly to the installation. Works are performed in sequence: first going to the bottom row of cabinets, thereafter - the top. And we'll show you how to act at every stage.

Content

  1. Installation of floor pedestals
  2. Wall cabinets
  3. Mounting on furniture hinges
  4. Mounting the tire
  5. installation of countertops

Installation of floor pedestals

If your home was taken to set an exploded view, modules can easily be mounted independently of the manufacturer's instructions (usually in the package). Before you install the kitchen, prepare the following tools:

  • screwdriver (screwdriver);
  • drill and hammer drill;
  • jigsaws;
  • Combination and imbusovye keys;
  • carpenter's level and square;
  • pliers;
  • clamps;
  • hammer.

After assembly, better fathom the basic dimensions of the finished module, as they may vary slightly from those stated. If everything is in order, and the bottom row of the furniture goes in size, it is time to set stone in its place. This phase checks the horizontal upper edges and the correctness of the line cabinets, modules are adjusted in height by means wriggle legs. It is better that they are 5 cm longer than the bottom strip - it's easier to maintain cleanliness in the kitchen, and the space under cabinets is well ventilated.

Installing the bottom row of kitchen

The work begins with the angle, and if there will be located the sink, corner cabinet must first mark under the output tubes. After checking into the walls of the enclosure make cuts under the Communication and then put a stand on its rightful place. Now you can hang it on the facades and proceed to install the following table.

Collecting furniture cabinets in a row, check whether the neighbors do not interfere with each other to open the door. If you cling to facades, their position must be adjusted by means of screws on the hinges.

Once the installation of the lower number of completed kitchen, cabinets are rigidly linked. For this shreds hardboard walls adjacent cabinets are attracted and held together by clamps with screws or special furniture coupler. The enclosures establish storage elements and hang facades. Screw heads, which turned out to mean closed decorative caps in the color of the walls.

Wall cabinets

The top row of modules must be placed above the worktop in 45-60 cm - a more accurate distance will determine the growth of the hostess and the height wall cabinets themselves. Make a mark on the wall, you need to draw a horizontal line, which will mark the attachment of a number of the border, it is also worth noting the top level, because it is more convenient to focus on him. Installation, as is the case with the lower tables, starting with the assembly and placement of the corner unit.

Installing the top row of kitchen

Two possible ways to set, we consider below, but for now tell you that still need to be taken when all the boxes will be mounted on the walls. Here again the need clamps and ties to individual cases to gather in a single structure, but to do so would have been on the top cover, knocking them together patch "patch" of pieces of MDF. Included with some headsets can also be a decorative cornice. As a rule, he put on a stud, but for safety should use more, and glue.

Mounting on furniture hinges

The cabinets can be hung from a hook in the wall or anchors driven into. For this to every body behind furniture hinges are screwed. It is important to accurately measure the height of the fasteners and perform markup correctly, constantly checking its level. Simple strap leave control cabinet position possible, and the error even half a centimeter will be visible.

Do not just hit the wall all the holes for the anchor - each of them have an additional check, hanging locker and exposing it to the level. A long process, and it is the only plus - the minimum cost of the fasteners. However, the load on all muscle groups while working you too assured.

Mounting the tire

Much easier and more reliable to another method - using special bus (profiled mounting bracket) and test portions. The first is a metal rail slides and holes for mounting to the wall. It is mounted horizontally, lowering 3-4 cm below the top mark for installation cabinets. Hinges are equipped with complex and hooks mounted on the inside of the side walls of the housing. And do the hooks are inserted into slots of the mounting plate, to which the rear of each module will have to cut a small hole right in the hardboard.

Installing kitchen cabinets on the bus

This method of attachment allows for installation alone cabinets with high accuracy and without any extra effort. Minor blemishes, markings or made during installation, are easily eliminated in the adjustment screws corresponding rigging. Also manufacturable hardware help adjust the distance between the cabinet and the wall, for example, if the top row of furniture covers thick ceramic panel or apron.

The internal shelves, pull-out drawers and other storage systems installed in the last turn, when the headset is completely take its place.

installation of countertops

Often outdoor kitchen furniture modules are each with its tabletop. In this case, they are simply combined in one unit via corner profiles. But first it will not prevent further process the slabs edges with sealant and ends adjacent to the sink or stove, and even close the metal slats. So you will save chipboard from damage and swelling.

If we need a solid surface, before you install the kitchen, consider the position of the main work areas: sink, stove and cutting table. The very same countertop have to first cut to size and prepare the mounting holes under the sink and stove embedded. countertop depth can fully comply with the dimensions of floor pedestals, but more often left margin of 1-2 cm, to get a small visor.

Installing the countertops in the kitchen

The finished plate is marked under the built-in appliances, holes are cut jigsaw (if chipboard). At the end of the work, all sections must be cleaned from dust, fluff sealant thoroughly and close the edge with tape or a special profile by screwing it with screws.

How to install sinks:

  1. Turn the sink drain up and put her on the table, cut around the contour of the marker.
  2. Cut and handle aperture, as described above.
  3. The lugs on the very body wash install fasteners - with its help it will be fixed on the slab countertops. At this stage, better to put a siphon at once.
  4. Turn the sink into the operating position, dipped in the prepared cutout and secure with screws from below.

To the pedestal table top is attached to the furniture dowels. For this drill the grooves on the bottom plane of the plate and the response - on the side of the case. Allowed and pivoted metal corners. In some cases, you may need additional installation brackets, which will transmit the weight of countertop and placed her on the equipment load-bearing walls. And after connecting the built-in equipment for a gap worktop close decorative skirting board of a suitable material.

Figure out how to install the kitchen can be a good idea to save on the services of collectors, and most importantly - to make all neatly without damaging the walls and pavements. When the work is completed, you will only have to enter the refrigerator, and the suite of furniture to fill the kitchen utensils.

1 Star2 stars3 stars4 stars5 stars (40 estimates mean: 4,70 of 5)
Loading...