Deciding to perform finishing new apartments with their own hands, you are sure will wonder about the work sequence. What are the stages of repair of an apartment in a new building - will talk about this in the material.

First performed all dirty and dusty work associated with the dismantling and transfer to another place baffles purification rough finish on the walls and fill the void inside them (if available).

Stages of repair of an apartment in a new buildingMany apartments are developers in the form of concrete boxes where future tenants will not only have their own make normal or textured plaster, painting and wallpapering, but also to perform wiring and wiring pipes.

All this, too, is done at a preliminary stage, before going directly to the roughing and finishing finishing facilities.

basic steps

  1. Demolition of walls, strengthening of doorways, punching and finishing arches and other activities related to the dismantling.
    The price of works is determined by the type of construction.
  2. The device interior partitions.
  3. ventilation device.
  4. The layout of water and sewer pipes.
  5. Wiring.
  6. Low voltage wiring (internet, telephone, security system, TV).
  7. floor screed execution.
  8. Plastering, putty walls.
  9. Installation of windows and doors.
  10. Mounting the air conditioner unit and air ducts for laying indoor unit.

the intermediate stage

  1. Laying of tile trim.
  2. Finishing drywall.
  3. putty ceiling.
  4. Installation of window sills.
  5. Apparatus ceiling decoration elements (ceiling dumbbell molding).

The final stage

  1. Wallpapering the walls, installation of wall panels, painted walls and ceilings.
  2. Installation of interior doors.
  3. Installation of decorative ceilings.
  4. Stacking the coating on the floor (linoleum flooring, carpeting).
  5. Installation casings.
  6. Installation of a plinth.
  7. Installation of switches and sockets.
  8. Installing ceiling lights and sconces.
  9. Installation of CCTV items (cameras, video intercom).
  10. Wiring for plumbing points (toilet, bath, shower)
  11. Installation of built-in closets.
  12. Installation of the indoor unit.
  13. Garbage removal.

Of course, not necessarily to make everything on the list. However, you should observe the sequence of repair of an apartment in a new building, so as not to alter once again the work done.

Stages of repair building

Design project

From repairs to the already lived-in house, renovated in new building is distinguished by its globality. It is important to first think about the little things and make a competent design project, where the repair steps in a new building would have been recognized.

To consider the document is worth everything - from the sequence of their actions to the quantity and quality of finishing materials that you plan to purchase. The project will be for you a blueprint and guide to action.

Note! For the first renovation in building better not buy expensive finishing materials. It is known that the new facilities required to undergo a phase of contraction (especially the brick houses, to a lesser extent - monolithic). Changing the geometry of the building is reflected in the decoration materials in the room. Therefore, in a few years the apartment again may require repair. When choosing materials, pay attention to affordable and flexible - fabric and film ceilings, wallpaper cloth, foam tiles for bathroom decoration.

So, before starting work on their new building, should draw up a design project. Even if you plan to make repairs in the building with his own hands, the project stands to professionals. After all, how skillfully he will be made, it depends largely on the final form of the apartment.

If you want to try yourself as a designer and make the project their own, special computer programs that create three-dimensional images can be used for this purpose.

After all the nuances will be registered on the paper, you can proceed to the subsequent steps of repair. Finishing works in the building can be divided for convenience into several time steps. For example, to allocate a segment for roughing routines (the dismantling of the walls, floor screed, wiring, wiring pipes, plastering) and finishing decorating.

It is also divided the work on such stages as the "wall", "ceiling" and "floor". After finishing one of them can move to the next refilling time intervals between themselves.

Summing up

We hope our article has been helpful to you. In order to more accurately understand the technological and practical issues on our website provides detailed photo and video instruction, in which you will find useful information on the question.