Piping: water in the apartment, the correct plumbing, make your own hands, a quartet in a new building, a plumbing

By correctly arranging the pipes, it is possible to significantly improve the operational properties of the room performed correctly pipework, can significantly improve the performance of the premises when repairing bathroom the most important step is the layout of the pipes. It is advised to make a different scheme, taking into account the peculiarities of the apartment and the position of the instruments. All the work can be done by themselves, but it is important to have some knowledge in the field of sanitary engineering.

content:
    • methods wiring plumbing
    • Proper circuit stacking plumbing
    • plan Sequence wiring water in apartment
    • Steps distributing water in the apartment with his hands
    • How to change the plumbing their hands( video)
    • Examples wiringspipes in the toilet( photo)

methods wiring plumbing

plumbing layout provides for the installation of water supply channels in the bathroom, toilet or kitchen for consumption. The main function of the wiring is to supply water to the place of use and drain the used liquid through the sewage system. The distribution of pipes depends on the area of ​​the apartment in the new building and the number of residents.

If you do not have the experience of wiring plumbing, then you should contact the professionals If you do not have experience in plumbing wiring, it is necessary to turn to professionals

methods of distributing pipes in the apartment:

  • Open styling;
  • Closed system.

In the case of an open installation, the bathroom is permanently accessible if necessary. For such wiring, steel or copper pipes are used to conduct a complex circuit. But the best option for pipes of water supply and sewerage is the use of metal-plastic elements. They can be joined by press fittings, creating a sealed joint. But the use of plastic or metal pipes is expensive.

Closed piping is quite popular due to space saving, because the pipes are hiding in the wall. But this option will require a special calculation of works and draft planning. For a hidden system, polypropylene is used, which is easily connected by a hot compact.

The rules for installing a closed system do not allow the laying of communications in the supporting wall. For such work, use integral pipes.

For hot water supply to the pipe, it is worthwhile to wear a corrugated hose. This is done taking into account the fact that the plastic expands when heated. The hose will allow the pipe to have some free space.

Proper placement scheme plumbing

Once the location of the bathrooms is defined, you need to buy equipment and explore design size. After that it is worth making notes on the installation of the water supply. Next, a wiring diagram is created. To properly dilute the pipes, you must follow a number of rules.

correct laying pipes comprises:

  1. Min intersecting elements;
  2. With an open system, the water supply and sewerage should be laid as close as possible;
  3. Free access to all connections must be provided at the planning stage;
  4. The main pipes are better to be mounted on the floor, and the outlets - vertically upwards, without oblique lines.

Choose the scheme of laying plumbing, depending on the area of ​​the room and its layout Choose the layout of the plumbing laying, depending on the area of ​​the room and its layout.

To make wiring your own, it's worth keeping to the rule of simplicity. The system should not become anything more complicated, and the amount of connection should be minimized. In the absence of knowledge, the water supply unit is best done open type.

With a closed system after the creation of the plan, they move on to creating niches in the wall and installing the pipeline. To distribute water in the bathroom can be used as a connection from riser to consumer, and vice versa. For joining pipes, a welding machine for hot pressing is required.

The connection can not be dismantled. If necessary, the site is cut out and replaced with a new piece of pipe.

It should be noted that the water divorce includes not only the pipeline. In addition to the plumbing itself, such as a washing machine, you will need to purchase water meters, check valves. Gearboxes and pressure regulators are also needed.

Sequence of layout of water distribution in apartment

First write a plan, which takes into account the consumption of materials and the dimensions of all terminals of the cranes. Also indicate where the equipment, pipes, wiring will be placed. Plumbing units in the apartment depend on the central water supply. Therefore, there are certain lessons in the selection of instruments.

Components of the plan:

  • Selection of materials;
  • Creating a wiring diagram for hot and cold water;
  • Determining the size of the system;
  • Preparing the toolkit;
  • Disassembly of the old water pipe.

The layout of the water distribution in the apartment can be done either by hand on paper or using a computer program The layout of the water distribution in the apartment can be done either manually on paper or with the help of the computer program

Among the materials are polypropylene, plastic and copper. It is important to weigh all the positive and negative points in order to make the right choice. When using polypropylene, you will have to master the welding skill. For metal plastic, press fittings can be used.

Piping in apartments is difficult due to the small size of the bathroom. That is why preference is given to the most compact version.

Distinguish between a serial or parallel wiring diagram. It all depends on the type of apartment building. A consistent version is suitable for apartments with a stable head of water. But it is best to choose the collection method, because it allows you to regulate the pressure of water to each source of water intake.

Stages of water distribution in the apartment with their own hands

To begin with, a plan is created that takes into account the location of the nodes and their dimensions. Then you should get rid of the old water pipe. In the new building, the plumbing unit has to be developed anew. In the old apartments, the already existing bathroom is taken as a basis, but it is better to change the system.

Collector wiring provides connection of each device separately.

When dismantling, first turn off the water supply to the apartment. Then all fittings and equipment are removed. It is better to take out all the equipment to have a place to work. In the presence of meters, they should also be removed. You can make a hot water supply from the water heater.

Before you begin to distribute water in the apartment, it is worth watching a training video with a master class Before proceeding with the water distribution in the apartment, it is worth watching the training video with the master class

Steps for connecting the pipe routing:

  1. First we collect pipes on the floor. It is important to comply with all dimensions and seal joints. We connect the cranes.
  2. Installation of pipes in certain sections. Next, we mount the risers to the mixers. To do this, twist the tee into the two ends of the cut pipe. At the end of each perpendicular pipe, it is required to fix the fitting.
  3. Next it is necessary to hide all communications in the wall. But remember that the connections must be freely available. Hide the wiring, joints, quad.

For an apartment it is best to use a collector for water supply. This is a compact version that is suitable for unstable pressure conditions. A suitable fitting is suitable for hot water supply.

How to change plumbing by one's own hands( video)

Pipe lay-out is the necessary measure when repairing a bathroom. It is important to correctly position the communication, so that access to and use of them is as comfortable as possible. That is why it is worthwhile to approach each stage of the work in a responsible manner.

Examples distributing pipes in the toilet( photo)



instagram viewer