Metal tiles in many respects superior to other types of roofing, such as slate, galvanized sheet metal, bituminous tiles and so on. Laying of the material is usually trusted by specialists, but if desired, you can perform the installation of the metal tile yourself.

Mounting of metal tiles by own hands

Mounting of metal tiles with your own hands

Advantages of the material

Content of the article

  • 1 Advantages of the material
  • 2 Step 1. Conducting the calculations
  • 3 Stage 2. Preparation of all necessary
  • 4 Stage 3. Base
  • 5 Stage 4. Thermal insulation
  • 6 Stage 5. Installation of tiles. Basic rules of
  • 7 Step 6. Individual elements of
  • 8 Stage 7. Arrangement of a valley
    • 8.1 Video - Laying of metal tiles
  • 9 Trapezium or triangle traces
  • 10 Features of material care

Strengths of metal tiles include:

  • light weight( about 4-6 kg/ m²);
  • simplicity of installation and repair work;
  • wide choice of colors;
  • no harmful components in the composition;
  • high strength( achieved through stiffening ribs);if properly installed, a 0.5 mm thick material is capable of withstanding loads of over 200 kg / m²;
  • resistance to temperature changes;
  • is the minimum thermal expansion.
    Metal tile

    Metal tile

Aside from the , has only increased noise level at atmospheric precipitation, but this can be done by installing a glass wool layer.

Roof covering with metal tile begins with calculations.

Metal tile

Metal tile

Metal tile

Stage 1. Calculation of

First we will understand one important point. Visually, the roof covered with this material is composed of rows and waves( the first pass across the ramp).The distance between the rows is called the step. If a sheet of tile has a step of 35 cm and six waves, then it is called a module. The modern market of building materials offers sheets for 1, 3, 6 and 10 modules.

Calculation

Calculation of

Important! If you want, you can order the shingles according to individual sizes, but it will be much more expensive. It should be remembered that the length of the sheet should not exceed 7 m and be less than 45 cm.

The calculations and layout takes into account the fact that joints and waves should form a single coating along the entire length of the ramp. After determining the number of modules, the amount of material is calculated by the roof area.

Additional elements

Additional elements

Accessories for roofing

Components for roofing

In addition to the metal, the kit also includes:

  • steel bars 2 m long;
  • steel sheets are 200x125 cm, having the same color as the tile.

Usually the slats are designed for roofs made with a slope of 30ᵒ, although if desired, you can make a fit under 11-70ᵒ.

Important! The minimum slope at which the installation of the shingles is allowed is 11ᵒ.

Stage 2. Preparation of all the necessary

The following equipment is required for the installation of the shingles:

  • metal scissors;
  • stepladder;
  • electric drill;
  • long rake;
  • screwdriver;
  • mounting tape;
  • measuring device;
  • hammer;
  • marker;
  • personal protective equipment( mittens, plastic glasses).

Also required are consumables:

  • waterproofing;
  • roof tiles;
  • roofing strips;
  • aerobics;
  • straps for ends and ridge;
  • decorative cover;
  • self-tapping screws, washers-seals to them;
  • boards 2,5х10 cm;
  • guide board.

Stage 3. Base

Tiling for metal tile

Tiling for metal tile

As noted earlier, the metal tile weighs a bit, so it does not need a reinforced base - it will require a conventional crate of wooden rails. The step of the battens should be calculated according to the size of the shingles, so that during the installation it is not necessary to drive the screws into the void.

Controller

Control Grating

Controller

Important! When calculating the step, the location of the windows is also taken into account - it is undesirable to place rafters above them.

Stage 4. Thermal insulation

Roof pie

Roofing cake

Thermal insulation is necessary not only to prevent heat losses, but also to protect against rain noise. At first the rafters are covered with a vapor barrier material( for example, "Isospan" or "Yutafol").Next, a layer of insulation( thickness no more than 25 cm) is laid, covered with antioxidant film and fastened to the rafters with wooden blocks.

Important! The material between the bars should hang slightly( about 2 cm), so that the condensate drains only into the drain.

Stage 5. Installation of tiles. Basic rules of

  1. Installation can be performed in one of two ways. If the laying of the sheets starts on the right, then each new one is superimposed on the previous one. If on the contrary, then the previous sheets are superimposed.
  2. For the correct assembly, the four tile sheets overlapping each other are first picked up, aligned, and then finally joined together by a single screw.
  3. Self-tapping screws should be of high quality, because the life of the roofing depends to a large extent on them. This must necessarily be galvanized screws with sealing heads made of propylene rubber, which hermetically fill the hole when twisting.
  4. A thickening appears at the junction of the four sheets. It must be removed, for which part of the angle is cut or straightened capillary ditch, located under the stamping dash.

Step 6. Individual elements of

Step 1. The end plates are overlapped( about 2 cm).The size of the wave is adjusted to the width of the ramp, otherwise the comb can fit on the pediment.

Mounting of the cornice

Mounting of the cornice

Cornice lath is fastened with nails to the lower bridle bar with a overlap of 100 mm

The curtain rod is fastened with nails to the lower bar of the overlap with overlap 100 mm

Step 2. A roofing strip is added, then an additional seal is placed between it and the material sheet.

Step 3. When installing pipes or windows that are below the ridge, sheets with one module are taken - two pieces for each element of the structure.

Step 4. With sloping skates between the material and the ridge bar, an aerial is installed, which will prevent the penetration of atmospheric precipitation under the skate.

Installation of an aerobic

Mounting the

aerial. Step 5. The hitch is fixed on the slats located at the ends of the structure. This should be done in such a way that it protrudes by 2-3 cm. In the case of a flat ridge, all elements are lapped, and if it is semicircular, then only according to the profile lines.

The horse

Connector

The horse

Connector

Important! If the slope of the roof exceeds 45ᵒ, then it is necessary to calculate in advance the compatibility of the specific model of the ridge with this angle. If this is not done, the consequences can be the most deplorable, up to a complete replacement of the roofing.

It is also worth noting that the slats of skates can be bent and unbend, if necessary, so that they repeat the angle of the roof.

Stage 7. Arrangement of a valley

The device of valley roofs from metal roofing

Arrangement of a roof valley from a metal roof

An additional board is attached to each valley. Installation in this case starts from the bottom and is overlapped in 25-30 cm. Below the level of the eaves is cut the lower bar, it is flanged. Under each obortovku and konek the sealant is put.

Endowa

Endowa

There is a gap between the axis and the sheets( minimum 8-10 cm).In the cut sheets, one and a half centimeters from the stamping line, screws are twisted. At the same time, when fixing, the fastener is made 25 cm from the axis of the valley. If everything was done correctly, then at the end of the works, the sheet in the place of fasteners will touch the board where the valley is located.

Installation of the bottom valley begins before the installation of the roofing material, since the water from it must flow precisely into this additional element

The installation of the bottom valley begins before the installation of the roofing material, since the water from it must drain into this additional element

Important! If errors were made, the fastening will be in other places and, as a result, gaps are formed on the surface through which the roof will flow.

To cover the trimmed sheets, decorative pads are used, when installing, you need to remember some important points:

  • installation should be performed from the bottom up;
  • does not need to be sealed between the tile and the cover plate;
  • products overlap( minimum 10 cm);
  • self-tapping screws used to fix the linings should not damage the valley.
    Protection of the valley

    Protection of the valley

Often the beginning and end of the grades are on the roof slope. Take, for example, the installation of a dormer window. Here under the roof there is a separate board. For the window itself, a cut is made in the sheet, and sealing material is laid along the walls. At the same time the cornice overhang is covered by a bar.

Then the slats of the valley, pre-cut at the edges, are fixed. The outgoing part must be extremely tightly attached to the sheet of shingles.

Video - Laying of metal tiles

How to fix metal roofing

How to fix metal tiles

How to fix metal roofing

How to fix metal tiles

Rules for attaching metal sheets with self-tapping screws

Rules for fixing metal tiles with screws

Layout of sheets

Scheme for laying sheets

Ropes in the form of a trapezoid or triangle

If the roof slopes have a trapezoidal or triangular shape, then additional bars should be installed.

Step 1. The bars are attached to both sides of the "ridge" along the folding line of the roof.

Step 2. The cornice board is installed, the crate is assembled.

Step 3. The eaves system is being built.

Installation of metal tile

Assembling metal tile

Roof of metal tile with your own hands

Roof of metal tile with own hands

Step 4. Tiles are stacked. This is done along the line of one of the edges or the axis. The first sheet is leveled on the ledge of the ledge.

Important! It is inadmissible that the distance between the cut off angular sheets set near the "ridge" is more than 10 cm.

Step 5. The following operations are performed to install the skate assemblies. The ridge bars are aligned along the angle of the "ridge".If a straight edge is used, it is cut at corners, and if it is semicircular, an additional plug( preferably plastic) is required.

Step 6. The ridge strip lies strictly on the axis of the "ridge".It is quite simple to execute this, if the corners of the skates are the same, and if different, then, accordingly, it is difficult. To control the contiguity of skates, a mounting tape of bright color is used.

After the seal is mounted the skate, made for color and in a structure similar to the metal

skate assembly

Chimney on metal roofing

skate assembly After the seal, a color-matched shoe with the same structure as the metal tile

Chimney on metal roofing

Chimney on metal tile

Chimney on metal roofing

Chimney on metal tile

Chimney on metal roofing

Chimney on metal tile

Features of material care

As already mentioned, the metal tile is coated with a polymer layer that protects against corrosion. But the constant impact of ultraviolet, precipitation and dust sooner or later becomes the cause of the destruction of the protective layer. That's why the metal roof should be cleaned regularly.

  1. Dirt and dry leaves are washed off with a damp, fleecy brush.
  2. Special cleaning agents for polymer surfaces can be used to remove more complex contaminants.
  3. Do not use aggressive chemicals - they can destroy the protective layer.
  4. Drains are cleaned by a jet of water under pressure. The jet should be directed from the ridge to the cornices.
  5. To clean the roof of snow, you can use only those tools that in principle are unable to damage the coating.

If these rules are observed, the metal tile will last about 50 years.