How does Cherepovets prepare for the heating season 2015?
When will the heating in Cherepovets start? On the street it's getting colder, and this issue is becoming topical among the city's residents. Until the end of September, according to weather forecasters, it will be quite warm. However, even now the city authorities are starting to connect heating. In social institutions, the batteries are already warm. It is expected that heat will soon be received by residents of residential quarters.
When the heating in Cherepovets, and how much repair of heating systems is completed, the city authorities no longer hide. And what to hide, if the housing stock of the city is prepared for as much as 99%.Almost all institutions received passports of readiness, which means that soon the heat will go to the objects of the housing stock. The exception is the three companies that manage the repair of heating in the city. Their task is to shortly repair heat heaters in several houses.
According to the rules, when heating is to be provided in 2015, kindergartens, hospitals, schools should be the first to receive it. Warm batteries are already in more than 70 schools and orphanages. Today, a trial run of the heating system is conducted, aimed at eliminating the shortcomings. As a result, they must detect and remove air congestion on heating mains.
What does the heat supply schedule depend on?
The timing of the inclusion of heating systems in Cherepovets depends on a number of conditions, the main of which are:
- availability of funds for timely start of heating;
- compliance with the timing of repair and maintenance work with the system.
The city administration of Cherepovets has allocated in 2015 for repair and maintenance of heating systems sufficient funds to finish the repair work on time.
Today 99% of consumers are prepared for heating start. Repair and preventive measures are carried out exactly in time.
Priority of heating supply in Cherepovets
Traditionally, the first institutions of heat supply will be social institutions:
- schools;
- children's homes;
- kindergartens;
- homes for the elderly;
- hospital.
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
Optimal temperature in a residential area
If you have doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius temperature | |
optimum | acceptable | |
Living rooms | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
Bathroom | 24-26 | 18-26 |
Corridor | 18-20 | 16-22 |
Access, ladder | 16-18 | 14-20 |
Storage pits | 16-18 | 12-22 |
What to do if the heating was not given to
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.