Scheme of installation of a hanging toilet bowl

click fraud protection

Installation of a suspended toilet, the main stages of the

Preparation for the installation of suspended sanitary ware includes the following works:

  • If it is intended to mount a suspended toilet bowl on a finished frame, then you need to assemble all parts of its structure according to the attached instructions and fasten it to the wall. It is worth noting that this method requires certain costs of money.
  • it is possible to install a toilet bowl and without using a special design. To do this, metal rods are fixed in the concrete wall, which will reliably hold the structure. Also in the wall there is a clutch, which provides drainage of water.

Installation of a hanging toilet, main stages

Installation of a toilet with self-installation

  • the first stage will be the installation of a drain coupling;
  • after that it is necessary to determine the height to which the toilet seat will be raised above the floor.
  • further it is necessary to draw a marking of places on the board where there will be fixing holes, usually this distance is 200mm;
  • then insert metal rods with thread into the wall, the length of the rod is determined taking into account the thickness of the walls of the toilet bowl, the distance for wall penetration and the width of the fixing nut.

Fastening the toilet through the wall

It is also possible to install the hanging toilet bowl by the way of fastening through the wall. For this, bolts of the required length are used, which are inserted into the drilled through holes, and on the other side they are screwed on the nuts, together with the washers. The wall must have a density of at least 400 kg / m².

Toilet bowl fastening through the wall

Scheme of installation of a hanging toilet

The scheme of installation of a hanging toilet bowl with their own hands includes in the seed three main stages:

  1. installation of formwork;
  2. concreting threaded fasteners;
  3. connection of the toilet bowl.

The process of installing the formwork is as follows:

  • previously drilled holes in the wall fill with glue and install the fastening rods in them;
  • on the rods mount three shields - central, with holes for fastening the toilet bowl and two side ones;
  • fixes the foam in the inner surface to install a drain pipe in this place, after the concrete has solidified.

After completing these works, they move on to concreting. To do this, prepare a cement - sand mixture, in a ratio of 1: 2, diluted with water. In the solution it is necessary to add silicate glue to improve the bond. The fixing rods that will hold the sanitary faience are covered with a polyethylene film so that the concrete mixture does not get on the surface of the thread. The solution is placed very tightly, preventing the formation of voids and shells, and then left to freeze for one week, with a temperature of at least 17 ° C.

scheme-installation-pendant-toilet-5

Connection

Connection of plumbing to the system is started from the flush tank:

  • is fed into the PVC hole by a 40 mm corrugation and connects it to the toilet bowl;
  • sealant seals connection points;
  • for 100% fixation withstand corrugation for 3 days at room temperature.

In order to avoid leakage in the future, it is necessary to purchase a quality sealant in advance, which is applied to the corrugated pipe sealing ring and the joints at the same time.

Connectivity

After this, the final installation of the suspended toilet bowl is carried out:

  • lift the toilet bowl to the height and fix it to the threaded rods using nuts;
  • does not test the structural strength within 24 hours;
  • connect the flush tank to the seat in the seat;
  • is replaced with a toilet seat.

This completes installation of the hanging toilet bowl with self-installation.

instagram viewer