How is Astrakhan getting ready for the 2015 heating season?
For the heating season 2015-2016.the city of Astrakhan is preparing very actively. The first objects provided with heat are hospitals, hospitals, sanatoriums, nurseries, kindergartens, schools, universities, etc.- are almost completely ready to supply the coolant to the system. Also, pressure testing and washing of heating systems in all districts of the city are actively carried out. The readiness of multi-apartment residential buildings is provided completely, despite the high debts for the provided services of housing and communal services, caused discontent among heat supply organizations.
Thanks to the work of the specially established staff for the preparation of the OZP, the pipelines for heating and heating systems, water supply and sewerage systems were inspected in municipal institutions, social facilities, as well as in residential areas. To ensure the availability of all heat supply systems from the regional budget allocated 423 million rubles.
Hydraulic testing of the system was successfully carried out in the summer of 2015 in mid-July according to the schedule. In the emergency areas, repairs and replacement of pipelines and fittings have been made, thus enabling the start of the autumn-winter heating season without delays.
What does the heat supply schedule depend on?
The timing of the inclusion of heating systems in Astrakhan depends on a number of conditions, the main of which are:
- availability of funds for timely start of heating;
- compliance with the timing of repair and maintenance work with the system.
The city administration of Astrakhan allocated the necessary funds for repairs and maintenance of heating systems in 2015, which will result in the preparation of all systems by the beginning of the heating season.
Today 85% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.
Priority of heating in Astrakhan
Traditionally, the first institutions of heating will receive social facilities:
- educational institutions
- hospitals
- municipal facilities
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
Optimal temperature in a residential area
If you have doubts about the quality of housing services in heating systems, make temperature measurements in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius temperature | |
optimum | acceptable | |
Living spaces | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
Bathroom | 24-26 | 18-26 |
Corridor | 18-20 | 16-22 |
Driveway, ladder | 16-18 | 14-20 |
Pantry | 16-18 | 12-22 |
What to do,if the heating is not given
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), the heating fee will decrease by 0.15%.