![Practical fence made from corrugated board](/f/f7/a3/f7a393129c4d94c80a2f18045b394544.jpg)
To build a fence of corrugated board with your own hands means to make a choice in favor of practicality, reliability and durability.
Profiled sheeting is an economical material, both in terms of money and time spent working with it.
You can make a fence of this material yourself, without resorting to the help of professionals.
A variety of colors, types of additional elements will allow you to choose it for the interior of any villa.
The material is durable, perfectly saves from noise and dust, it is durable, it will perfectly protect a site of a summer residence or the private house from strangers. We will analyze in stages, how to make a fence of corrugated board and see the photos of drawings.
Contents:
- What is required?
- The first stage is the preparatory
- The second stage is the installation of the pillars
- The third stage is the installation of the transverse logs
- The fourth stage is the installation of the corrugated board
- The fifth stage is the completion of the installation work
What will be required?
If you decide to choose this material, then you are not mistaken, because the fence device from the corrugated board is quite simple.
The fence itself consists of the following components:
- sheets of corrugated board;
- supports( metal pipes);
- metal strips for lateral fastening;
- logs - for joining the corrugated board and supports;
- dowels.
The height of the pillars depends on the height of the hedge.
Types of poles - round or square, which metal pipes to choose - you decide, they are all fixed in the foundation.
In the photo below - the scheme of the fence.
For concrete mortar, from which the foundation will be, you will need sand, cement, crushed stone. The foundation is prepared in the following proportions: 1 bucket of cement, 2 buckets of sand, 3 buckets of rubble.
To form the foundation, you need a level.
Prepare tools to fasten the screws when you fasten the main parts to the supports. Let's consider step by step how to build a fence of corrugated board.
The first stage - the preparatory
Like any other, the construction of the fence from the corrugated board begins with the preparation of materials, the study of installation rules.
Correctly mastered on paper technology will significantly reduce the production of fencing for the dacha.
The first thing that needs to be done is the layout of the future enclosure fencing.
After measuring the perimeter of the plot, it is necessary to calculate how many support pillars will be required, given that the distance between them is 2-3 meters.
To make measurements more accurate, it is better to use pegs in places where you plan to install supports. Mount tightly in the earth is not necessary.
The thread is stretched between them and the distance is measured by a construction tape measure.
After the measurements have been made, we draw a draft of the future enclosure fencing and calculate the total number of materials that we will use.
At the same stage you can choose the types, colors of corrugated sheets.
The second stage - the installation of support pillars
On the previously marked perimeter of the dacha digging pits depth of 1.5 meters. It is necessary to put the supports exactly on the vertical immediately on the foundation.
Therefore, the installation is accompanied by pouring the pipes with concrete mortar.
Important! Mount the support concrete only after the level is checked, how correctly it is installed.
The foundation of foundations is poured in depth by 1 meter. The remaining distance is covered with a roofing material, covered with sand and left for three days.
In the photo below - the scheme of installation of support pillars.
The third stage is the installation of transverse logs
The fasteners are placed parallel to each other.
Their number is determined by the height of the barrier, make at least two.
This number is sufficient if the fence does not exceed two meters, otherwise an additional row will be required.
It is better to mount logs to poles by welding.
This will ensure reliability and durability.
Fourth stage - installation of
corrugated board After the logs are installed, we proceed to work with sheets of corrugated board.
Be very careful during installation, observe safety rules to avoid cuts.
You can fasten the sheets to the slats using metal screws, but it is better to use metal rivets.
So you will warn the dismantling and the theft of corrugated board.
On the photo is the fence of the fence.
The fifth stage - the completion of the installation of
After the installation of all parts of the fence is done, it is necessary to treat all elements with a primer. Pain the fence in two layers to prevent corrosion.
This completes the installation work. As we see, the technology is quite simple and it is quite possible to put it yourself.
Which is better - choose a fence from the corrugated board with your own hands or with the involvement of specialists - it's up to you.
Making a fence of corrugated board is below on video.
Video:
Care of the fence is to clean it from dirt.
Profiled sheeting is easy to clean with any soap solution.
Detergents containing a solvent are not recommended for use in order not to disturb the structure of the material.