How is the construction of a frame house going

Every family dreams of their own country house, but not everyone can afford to make the dream come true.

Even for the construction of a small one-story house, large investments are needed. Not to mention the big two-story cottage. At the moment, a frame house is considered the most budgetary option.

This is a lightweight, practical, but high-quality and durable building. For a long time, many believed that it was impossible to live in a frame house in the cold season, that it was short-lived and could simply collapse in a strong wind or hurricane.

However, such a myth was quickly refuted. In its structure, the frame house resembles a thermos, so that the heat remains in the room for a long time. The frame house will be warm even in winter, and a strong wind will not be able to destroy the house.

The process of building a frame house

First you need to choose a site for construction and prepare the ground for work. To build a frame house, you need to use an inexpensive and lightweight foundation, for example, a strip or pile foundation. After installing the foundation, you must perform the following steps:

  • to carry out the installation of the floor and walls;
  • perform roof installation and house insulation;
  • carry out finishing work. For the construction of the main structure, special sandwich panels are used. They have a specific structure. In most cases, they already have an insulating option. The panels are large, but not heavy. They are easy to install and fix.

Due to its parameters, the structure is erected as quickly as possible. You can build such a house in just 1-2 months. Moreover, you can work both in winter and in summer. This will help to avoid downtime, the structure will not deform at the same time.

Here It is important to remember that the panels must be treated with special impregnations to protect the structure from moisture, chemicals, fire and insects. Holes are made in the panels for windows and doors, when the main structure is erected, installation is carried out interior partitions, and only after that you can mount the roof, carry out communications and proceed to finishing.