In principle, you can break anything. But if we are not talking about the demolition of the building, but only about the overhaul, then in the process of dismantling the floor in the apartment it is necessary to comply with a number of rules, since this largely determines the scope of further work( mainly preparatory measures) and the quality of the new"Finish" finishing. Does everyone know how to properly disassemble the old cover and how much will it cost?
This is one of the reasons why this work is often trusted by specialists. But there is another. In some cases, you need a special tool that does not belong to the category of "household" and, accordingly, there is not in every house. If you calculate all the costs associated with his rent, as well as the time spent on "denuding" the overlap( and in the absence of experience, it may take a lot), it often turns out that it is more appropriate to contact the relevant organization that provides such services.
Everywhere their prices, conditions, terms and so on. But if they are reduced to a common denominator, it turns out that in a day( and in fact, a working day), the brigade is able to perform the whole complex of operations over a large area. The natural question is how much do you have to pay?
The final cost of the work depends on its volume. You can save a lot if you perform some of the operations yourself. Here are the approximate( starting) quotations applied to the Moscow region, as the cost may increase depending on the conditions. And the reader himself decides what can be done independently, and what to entrust to professionals.
Type of work | Type of coating, features | Unit.amend. | Price( rubles / unit.) |
floor Dismantling | board + lags | m² | 170 |
concrete | 950 | ||
Dismantling | screed 30 mm | 275 | |
30 mm | 375 | ||
Withdrawal coating( 1 layer) | linoleum | 62 | |
parquet | 105 | ||
board parquet | 70 | ||
hardboard | |||
Removal plinth | tiles | п.м. | 45 |
plastic, wood | |||
Cleaning work place | trash collection, for the 1st floor | 0,75 | |
removal and delivery for recycling | 3 900 |
Note
When signing the contract, you should pay attention to whether the last 2 items are listed in the work list so that it does not work out so,that the export of garbage will have to be dealt with by the owners themselves. The recycling of construction waste is a rather difficult issue.
"Just throw" in a container standing next to the house, large pieces( such as concrete) can not be. For this, administrative responsibility is provided, and who did it, then it will be easy to determine. Neighbors are always aware of who is being renovated.