Do you own a vehicle, economic equipment, all kinds of trailers and other similar devices? Congratulations! These things are useful and necessary. To ensure that they remain their work capacity as long as possible and serve as long as possible, it is necessary to create the proper conditions for their storage. At a minimum - to provide reliable protection against atmospheric precipitation.

Carport for the car

Awning for the machine with their own hands

With this task, a freestanding canopy on a wooden support frame with a gable roof will perfectly handle it. We will build it.

Wood species Hardness( according to Brinell) Density( kg / m3) Stability Color change trends
Birch 3,0 600 medium color becomes deeper
Larch 2,6 500 good acquires shades of gray
Oak European 3,7 700 good color becomes deeper
Ash 4,0 700 average from light to straw, tan
Pear 3.3 680 average blushes
Cherry 3,0 580 good from the lightta-pink to deep reddish shade

Canopy

canopy construction

canopy Our canopy measures about 900x750 cm. The plane of each roofing ramp is about 500x750 cm. In general, this is 1000x750 cm, i.е.75 m2 of total area.

With the function of supports for this canopy, concrete poles with a diameter of about 300 mm will perfectly cope. Each of these supports can withstand an average of 1 ton of weight. In practice, this value is even more impressive, but we will believe the approved standards.

We multiply the total area of ​​roof rajids by the value of the snow load for our region, add the weight of the roof to the result, divide the calculated number by 1000 kg and find that about 7.5 poles are needed to ensure the proper stability of the canopy of such dimensions. We surround in the big party, i.е.up to 8. As a result, we will establish a support in the corners of the canopy and one rack at the center of each span.

Supports will be immersed to a depth of about 1.2 m. With such a foundation, the canopy does not exactly fail.

Outline diagram

Schematic of awning

Building a canopy: step by step instruction

The first step. We make cavities for installation of supports. This will help us drill a diameter of 30 cm. It is better to use an automated drilling rig - to drill more than a meter deep manually long and difficult. At the same time we get stones and other interfering objects that come across our path.

We make grooves for the installation of supports

We make cavities for installation of supports

The second step. The grooves are ready. We make formwork for the pillars of special paper tubes - are sold in modern construction stores. As a result, the pipes will form beautiful columns above the ground with a height of 30-50 cm.

The third step. We prepare the concrete. It is easiest to buy a ready-made dry mixture in bags and dilute it with water in accordance with the instructions.

We prepare concrete

We prepare concrete

The fourth step. Fill the columns. In the fresh concrete we insert the brackets for further fixing of the wooden racks with a cross section of 15x15 cm.

Methods of installation of pillars

Methods of mounting the pillars

The brackets have an armature leg, which is inserted into still freshly poured concrete

The brackets have a reinforcement foot which is inserted into the still freshly poured concrete

Columns

Columns

Columns

Columns

Installation of support poles( foundation)

Installation of support pillars( foundation)

Fifth step. We carry out the sawing of timber and boards according to the size of the elements of our canopy. Everything is perfectly visible in the photos.

The sixth step. We install and fix the support posts on concrete poles. It is recommended to do this not earlier than 3-4 weeks after filling.

Installation of support poles

Installation of support posts

Pillars

Posts

Pillars

Posts

The seventh step. We attach to the vertical racks of the board of the upper carrier of the strapping. To do this, we use a double board with a width of 30 cm and a thickness of 4 cm. A plain unprocessed board will do - it will be under the roof and bad weather will not harm the wood in any way.

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Top harness

Upper harness

For connecting boards with timber we use bolts with a diameter of 1 cm with a minimum of 20 mm washers.

The seventh step. Add to the main posts a second supporting board and tighten all the elements of the construction with bolts. We make braces from the bars 10x10 cm.

The eighth step. We collect roof trusses. For their manufacture, a board with a width of 10 cm and a thickness of 4 cm is suitable. The design is standard and has the form of a triangle. For greater rigidity, we fix in-between the triangle intermediate veins from the bursa or the board. Farms are more convenient to collect on the ground, and then fasten them to the harness already ready.

Rafting trusses

Roof trusses

Rafting trusses

Roof trusses

Roof trusses are mounted on load-bearing beams at the same distance from each other

Roof trusses are mounted on load-bearing beams at the same distance

Roof trusses are mounted on load-bearing beams at the same distance from each other

Roof trusses are mounted on load-bearing beams at the same distance

Ninth step. We sew the established farms with the OSB board. The recommended thickness of the skin is 1.2 cm.

We sew the established farms with the OSB board

We trim the installed trusses with the ASB

Sewing the gable roof, for which you can use either plywood or board

board. The ends of the gable roof are sewn, for which you can use either plywood or

board. The tenth step is the .Lining the roof with metal or other material at your discretion. Preliminary it is necessary to fix a waterproofing material to the crate.

Eleventh step. Sew up the roof gables of our canopy with siding, lining or other material of your choice. If desired, we can attach the cross-members to the vertical supports and cover the whole canopy - this moment is left to the owner's discretion.

Lining the roof with metal or other material

Lining the roof with metal or other material

Next, we need to install the storm pipes and bring them to a pre-selected location, for example, in an inter-ditch trench. This event deserves a separate consideration.

Brand Sheet width, mm Useful sheet width, mm Profile height, mm Thickness of metal, mm
C-8 1200 1150 8 0,4-0,8
C-10 1155 1130 10 0,4-0,7
With-15 1200 1150 15 0,4-0,8
C-18 1150 1100 18 0,4-0,8
C-20 1150 1100 20 0,4-0,8
C-21 1051 1000 21 0,4-0,8
C-44 1047 1000 44 0.5-0.8
MP-18 1150 1100 18 0.4-0.8
MP-20 1150 1100 18 0.4-0.8
MP-35 1076 1035 35 0.5-1
H-60 ​​ 902 845 60 0.5-1
H-75 800 750 75 0,7-1,2
H-114 646 600 114 0,7-1,2
НС-35 1100 1035 35 0,5-1
НС-44 1050 1000 20 0,4-0,8

Installdrainage

It will be plastic.

Important note! The plastic is subject to temperature expansion. To compensate for the deformation, a movable joint must be made every 8 m of the pipe length. If you are going to fix the drain with an adhesive sealant, make a connection every 8 m on the rubber seal. This will be sufficient to compensate for temperature deformations.

Gutter system

Gutter system

The system will be mounted so that the receiving hole is in the lower part of the roof slope of our canopy. We choose the side of the roof, focusing on the location of the ditch for reception of drains.

The first step. We fix the hook-holders. We install the gutter with a slope in the direction of the water inlet. To ensure the required inclination of the trough, we use hook-holders. We mount them at a minimum with a 0.5-cm slope for each meter of the length of the drainage structure. The marking for the installation of hooks is as follows:

  • we find the bottom or top point of the drainage system for mounting the outer bracket. The extreme brackets are installed at a distance of 100 mm from the edges of the water intake;
  • knowing the required length of the system, we recede from the extreme point a distance equal to 0.5 mm multiplied by the total length of the gutter in meters. We mark the second point;
  • pull the rope between two marks and fix the hooks, orienting on it;
  • we mount hooks with half-meter step.

Installation of drains on the roof

Installation of drains on the roof

Second step. Adjust the length of the pipe. Cut off excess with a hacksaw. We clean off the scrap with a sharp knife. Saw off so that during the cutting process the geometry of the pipe section is not violated.

The third step. Install the pipe on the hooks. If we use plastic hooks, first insert the back edge of our gutter in the groove on the fasteners, and then lower the front edge of the pipe and press. As a result, the trough snaps into place and simply locks into place.

Gutter system installation

Gutter system

When installing on metal fasteners, first lay the gutter on the fasteners and bend the flexible tabs so that they cover the pipe.

The fourth step. Install the funnel. Cut out the hole in the right place of the trough and apply a funnel to it from the bottom. We will fix the fixation with glue. To do this, first clean the surface, abundantly apply the binder composition to the joining elements, wait for the mixture to dry out, and after that we grease the additional seam.

Important! You can glue only with special PVC compounds.

Gutter installation

Gutter installation

Trough installation

Assembling the gutter

Trough installation

Gutter mounting

Fifth step. We collect pipes and bends in a single drainage system. With the help of the knees, we can set the desired direction of our pipe. At the joints of pipes and elbows, we install the additional fastening clamp.

Gutter installation

Gutter installation

Direct connection of pipes and elbows is done by glue. The order of its use was considered above. The pipe holders are mounted in steps of 2 m.

Gutter installation

Installation of the

water drain. In the end, we can only sew the gable roof gables with siding, lining or other material of your choice. If desired, we can attach the cross-members to the vertical supports and cover the whole canopy - this moment is left to the owner's discretion.

The canopy is ready. We can take it into permanent operation.