Specifications for gas connection

click fraud protection

The process of connecting the house to the gas pipeline communication can be divided into two main parts:

  • Obtaining the technical specifications for gas connection
  • The connection to the

technical-conditions-for-connection-gas-1
gas system The technical conditions( gas) determine the maximum load at the place of connection of the housing to gas communicationsand immediately the term of the planned connection. Gas supply is one of the types of engineering and communication networks. The special code defines the rules and procedure for providing technical conditions for the provision of centralized gas supply of housing, in accordance with which, the order and the period of connection to gas supply will be established.

Obtaining the technical specification for gas connection

You will be told about the organizations that provide technical specifications in the local administration department, as the process of obtaining is very time-consuming and laborious, which is due to the collection of documents and some waiting time.
technical-conditions-for-connection-gas-2

Stages of housing connection to the central gas supply network

  1. The first stage is the permit for gasification of housing from "oblgaz."For which you need documents: one of the documents that confirms the ownership;act of acceptance into operation;those. Passport issued by BTI;passport data of the owner( customer) and TIN;application for technical specifications.
  2. The second stage is the housing gasification project, which is developed taking into account all the features of the facility. The project requires the coordination of heating equipment and gas appliances, as well as their placement. When the project is drawn up, it becomes possible to make preliminary calculations for the cost of work.
  3. The third stage, directly installation works on installation of the gas pipeline on the site and connection of the house to the central gas main. After that the representative of the regional gas company or Gorgas provides a receipt of technical supervision.
  4. The final stage that allows obtaining technical specifications for gas is the conclusion of a gas supply contract and the sealing of a gas meter, this should take place within three weeks from the date of submission of the required documents. And one of the mandatory procedures is the passage of a safety briefing. This procedure is mandatory, because misuse can have serious consequences.

technical-conditions-for-connection-gas-3
If you issue the documentation immediately according to all the rules, there will not be any problems in the future either with checks or with operation. However, if you try to circumvent the law and do not complete the authorization documents, you can run into a fine.