When will give heating in Bratsk in 2015

click fraud protection

How does Bratsk prepare for the heating season 2015?

Currently, the city is being prepared by the time it turns on the heating in Bratsk. Preparation for the heating season 2015-2016 is held according to the approved schedule. The repair results are evident: by the end of the summer, major repairs of steam, water heating, and turbine equipment have been completed. Testing showed that the equipment is fully ready for the heating season.

Bratsk is preparing for the heating season

When Bratsk is given heating, repairs of all heat-conducting paths, boiler rooms, boiler equipment should end. Today works on repair of heating mains continue. Most of the planned work is done, it remains for the small. Various parts of the city were tested, as a result of which problem areas were identified. At many sites worn out parts of the pipeline were replaced. In addition to the overhaul of the heating system, the city authorities took care of restoring the destroyed improvement in time.

In Bratsk there is a check of the heating system

By the time heating is due in 2015, all repair work will be completed and all objects of the city will receive certificates of readiness for the heating season. First of all, the heat will come to children's homes, hospitals. Schools and kindergartens, and even then the supply of heat will please and residential quarters.

Completed in Bratsk work to replace the pipeline

What does the heat supply schedule depend on?

The timing of the inclusion of heating systems in Bratsk depends on a number of conditions, the main of which are:

  • availability of funds for timely start of heating;
  • compliance with the timing of repair and maintenance work with the system.

The city administration of Bratsk has allocated in 2015 for repair and maintenance of heating systems so much money to be able to finish overhaul of equipment and heat-conducting networks in time.
Today, 96% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.

Priority of heating supply in Bratsk

Traditionally, the first institutions of heat will receive social institutions:

  • schools;
  • children's homes;
  • kindergartens;
  • medical facilities.

After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.

Optimal temperature in a residential area

If you have doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:

Room Celsius temperature
optimum acceptable
Living rooms 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Storage pits 16-18 12-22

What to do if the heating was not given to

Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.

By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).

If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.