How does Blagoveshchensk prepare for the heating season 2015?
When the heating in Blagoveshchensk is switched on, all repairs of heating systems, boiler houses, and social infrastructure facilities will be completed. Obligatory 100% preparation of housing stock. In the summer, Blagoveshchensk was preparing for the winter period. One of the large boiler houses was tested, which provides heating for two kindergartens, a hospital, a school, 45 residential buildings and 29 non-residential buildings. Preparation of the boiler group and boilers has already been carried out, boilers have been cleaned.
Management companies were to prepare 1,789 kilometers of heating mains, 593 boiler houses, 1,815 kilometers of water supply networks, as well as more than 25,000 kilometers of electric networks. All repairs must come to an end, when in Blagoveshchensk will be given heating.
At present, the fuel supply for the upcoming heating season continues. In early summer, the authorities planned that by September they would form an absolute stock. Heating repairs in individual houses of the city are continuing. The most frequent disruptions are provided by the systems inside the house. Therefore, management companies ask residents of the city to take care of the batteries, risers and the pipeline in the cellars, otherwise, when heating is due in 2015, they will remain without heat.
What does the heat supply schedule depend on?
The timing of the inclusion of heating systems in Blagoveshchensk depends on a number of conditions, the main of which are:
- availability of funds for the timely start of heating;
- compliance with the timing of repair and maintenance work with the system.
The city administration of Blagoveshchensk allocated in 2015 for repair and maintenance of heating systems 115 million rubles.
Today 96% of consumers are prepared for heating start. Repair and preventive measures are carried out exactly in time.
Priority of heating supply in Blagoveshchensk
Traditionally, the first institutions of heat will receive social institutions:
- schools;
- kindergartens;
- of the children's home;
- medical institutions;
- home for the elderly.
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
The optimum temperature in a residential building
If you have any doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius temperature | |
optimum | acceptable | |
Living spaces | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
Bathroom | 24-26 | 18-26 |
Corridor | 18-20 | 16-22 |
Driveway, staircase | 16-18 | 14-20 |
Pantry | 16-18 | 12-22 |
What to do if the heating was not given to
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.