How does Sterlitamak prepare for the heating season 2015?
Residents of the city do not cease to be interested when they turn on the heating in Sterlitamak. The coming winter promises to be harsh, which forces local authorities to carefully prepare for the heating season 2015-2016.
A special headquarters was created in the summer, where all urgent issues are solved. In the plans of resource-supplying companies it was necessary to prepare more than 1300 houses of the city. At this stage, most of the houses have been prepared for winter. When Sterlitamak is given heating, the entire housing stock, as well as social infrastructure facilities, should be fully prepared for the winter.
The task of the authorities of the city was preparation for the heating season of housing and communal services, the area of which is about 89 million m2, as well as more than 400 boiler houses, more than 60 heat supply points, 8,000 kilometers of water supply routes and 1,000 kilometers of heat supply. At this stage, social facilities are fully prepared. The readiness of the housing stock is 98%.By mid-September, all resource-supplying organizations were required to obtain a readiness passport.
The exact date, when heating is due in 2015, is not called. It remains to wait for the thermometer to drop to +8 degrees.
What does the heat supply schedule depend on?
The timing of the inclusion of heating systems in Sterlitamak depends on a number of conditions, the main of which are:
- availability of funds for the timely start of heating;
- compliance with the timing of repair and maintenance work with the system.
The city administration of Sterlitamak allocated more funds in repair and maintenance of heating systems in 2015 than in the past.
Today 98% of consumers are prepared for heating start. Repair and preventive measures are carried out exactly in time.
Priority of heating supply in Sterlitamak
Traditionally, the first institutions of heat will receive social institutions:
- schools;
- kindergartens;
- of the children's home;
- medical facilities.
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
The optimum temperature in a residential building
If you have any doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius temperature | |
optimum | acceptable | |
Living spaces | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
Bathroom | 24-26 | 18-26 |
Corridor | 18-20 | 16-22 |
Driveway, staircase | 16-18 | 14-20 |
Pantry | 16-18 | 12-22 |
What to do if the heating was not given to
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.