Basic elements for installation work

When connecting the sewer sink to the drainage system, plastic outlets, corrugated or eccentric cuff systems, as well as fan pipelines should be used. To use the pipe pipes when installing the toilet, the following rules must be observed:

  • No trimming of such pipes is permitted.
  • Any changes in their geometric shape are not permitted.

It should be remembered that corrugated cuffs differ from eccentric cuffs. The first variant can be bent at different angles, as well as along the length, and the second version of the cuff turns only along the axis and due to this different deviations from the coaxially connected pipes are compensated.

When corrugated cuffs are used to connect the installation, it helps to avoid problematic places, if any. Also, this connection is used when connecting to a sewer system, since it has different sockets.

How to connect the toilet bowl to the sewer

Connection of corrugated pipes

The basic connection procedure consists of:

  1. To work the toilet in the drainage pipe, you need to insert the corrugation and do not forget to place it with silicone gel.
  2. Sewage sink must be connected to the pipe by means of a connection, with the second part of the corrugation. To check for serviceability, you need to fill the tank with water and lower it.
  3. The toilet bowl must be attached to the floor of the room using dowels.
  4. In the marked places it is necessary to make holes for fastening the installation and fix the dowels.
  5. The sewage sink is fixed to the intended location with the help of a corrugated pipe, which in turn is lubricated with acrylic plastic. If at check, nothing flows, then you can add everything.

connecting the toilet to the sewer 1

Connecting the toilet bowl without corrugated pipes

In order to make the toilet connection to the sewer without corrugated pipes, remember the following:

A special branch pipe is used which is called an adapter or a fan tube. There are three types of connection:

  • The oblique release. At the moment, this connection is not relevant, because it is used in the floor, but before that it was very common.
  • Vertical output. This connection is performed at an angle of 90 degrees.
  • Horizontal release. Installation of such a plan is done at an angle of 30-40 degrees in the wall.

connection of the toilet to the sewer 3

Connecting the toilet with a vertical outlet

In this connection, the outlet has a downward position, and a branch pipe with a siphon is located in the sewer sink. With this design, this installation can be arranged at different angles. For proper installation, you need:

  1. After all the marks have been set, the screw flange must be installed, which must be with the retainer.
  2. The drainage pipe should be located in the center of the edge.
  3. Sewage sink must be installed on the flange, and the outlet pipe must be firmly pressed against the drainage pipes.

Connecting the toilet with a horizontal outlet

This method of installation is most popular, because when using it, the toilet is attached to a specific wall. The very release of the installation is located in the back of the toilet. With the help of a special seal, an outlet pipe is attached to the sewer pipe.

It should be remembered that if the installation has a direct outlet, then for its connection it is necessary to use screws and dowels. Self-fastening of the toilet should be done very carefully, you do not need to tighten the screws because you can damage the toilet ramp.

Connection with oblique descent

The connection of the toilet bowl to the sewer can be carried out using an oblique connection, which has such technological processes of installation:

  • The outlet of the sewage system must be covered with a certain paint, which is mixed with linseed oil.
  • A resin strand is wound overhead, the branch of which by 0.5 centimeters should be in a free position.
  • The resin strand must be covered with paint.
  • Installation of the installation is carried out by fixing the process in the socket of the drainage pipe.