When will the heating in the Mines in 2015

click fraud protection

How does the town of Shakhty prepare for the heating season 2015?

When the heating in the Mines is connected, the city will be fully prepared for this. Today Shahty is almost in full readiness for the heating season 2015-2016.All planned work at the end of spring is coming to an end, in particular, by the beginning of the season, boiler houses, residential stock, heating mains, water supply networks are ready. Especially problematic in the course of repair work was the city heating main, which was replaced with insulation. In addition, worn sections of the heat main were to be replaced.

In Shakhty, work has been completed to replace the dilapidated parts of the pipeline

The city is fully provided with the materials necessary to eliminate accidents. In order to prevent malfunctions and irregularities in the system operation, water flushing facilities are regularly flushed. To this end, the city authorities have been occupied by special pumping stations capable of operating on water. Therefore, when the Mines are given heating, the city will be protected.

In Shakhty repair of heating systems is coming to an end

When heating is due in 2015, all facilities must be 100% ready. That is why utilities, management companies, as well as directors of the social sphere and educational institutions should take care to prepare by October 1 for the beginning of the heating season.

In the Mines are waiting for the beginning of the heating season

What does the heat supply schedule depend on?

The timing of the inclusion of heating systems in the Mines depends on a number of conditions, the main of which are:

  • availability of funds for timely start of heating;
  • compliance with the timing of repair and maintenance work with the system.

The city administration of the city of Shakhty has allocated enough funds for repairs and maintenance of heating systems in 2015, so the repair works promise to be completed on time.

Today, 98% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.

Priority of heating supply in the

Mines. Traditionally, the first institutions to receive heat are social institutions:

  • schools;
  • kindergartens;
  • hospital.

After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.

Optimal temperature in a residential area

If you have doubts about the quality of housing services in heating systems, make a temperature measurement in the apartment's premises. The following parameters should be optimal for SANPiN 2.1.2.1002-00:

Room Celsius Temperature
Optimal Tolerable
Dwellings 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Entrance, staircase 16-18 14-20
Pantry 16-18 12-22

What?do if the heating is not given

Find out with whom you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.

By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).

If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), the heating fee will decrease by 0.15%.

instagram viewer