How is Yuzhno-Sakhalinsk getting ready for the 2015 heating season?
Yuzhno-Sakhalinsk is now at the repair stage, which significantly affects the date of launch of the central boiler house of the city. As a result of the deterioration of the pipeline on the Physical Training Reservoir, all the forces of the utility divisions are leaving to eliminate the existing failures. According to experts, it became known that the heating main of the above collector was worn down by almost 80%.
Due to the existing shortcomings in the city, hot water is suspended. Residents with special patience are experiencing repair work, relying on the fact that with the onset of the first cold weather heating apartments and social institutions will begin immediately.
What does the heat supply schedule depend on?
The timing of the inclusion of heating systems in Yuzhno-Sakhalinsk depends on a number of conditions, the main of which are:
- availability of funds for timely start-up of heating;
- efficiency of repair services, eliminating the breakdown of the heating main;
- compliance with the timing of repair and maintenance work with the system.
The city administration of Yuzhno-Sakhalinsk has been carrying out a number of repair works to date. The exact amount has not yet been named, which were allocated in 2015 for repair and maintenance of the city's heating systems.
Today it can not be said that 100% of consumers have been prepared to start heating. Repair and preventive measures are carried out before the current period.
Priority of heating supply in Yuzhno-Sakhalinsk
Traditionally, the first institutions of heating will receive social institutions:
- kindergartens;
- school;
- hospital.
After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.
Optimal temperature in a residential area
If you have doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:
Room | Celsius temperature optimum | acceptable |
Dwellings | 20-22 | 18-24 |
Kitchen | 19-21 | 18-26 |
WC | 19-21 | 18-26 |
18-26 | ||
18-26 | 16-20 | |
16-20 | 16-20 | |
16-18 | 14-20 | |
Storage pits | 16-18 | 12-22 |
What to do, if heating is not given
Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.
By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).