When they give heating in Saransk in 2015

click fraud protection

How does Saransk prepare for the heating season 2015?

When the heating is due in 2015, the city must be prepared completely. This applies to social infrastructure, housing, and municipal enterprises. As the representatives of the mayor's office inform, Saransk is in full readiness for the heating season. True, there are a lot of dents at Khimmash that appeared when the pipeline was replaced by the employees of the company responsible for this, "TeploTrans".According to the head of the city, these works do not proceed as quickly as we would like, because they can give heating in a couple of weeks.

In Saransk are waiting for the activation of heating

When will the heating in Saransk turn on? It interests absolutely everyone. Last season, the opening of the heating season took place on 1 October. This date is preliminary and for connection this year. By this time, the daily temperature should not be more than +8 degrees.

In the apartments of residents of Saransk already cold

At the beginning of the repair work, the city authorities put the maximum bar. It was planned to make repairs in the boiler-houses of the city, in water, heat, electric, and sewage networks. When heating is given in Saransk, readiness certificates should be absolutely for each object of housing stock. The first heat will come to socially significant institutions.

Repair of heating in Saransk is almost over

What does the heat supply schedule depend on?

The timing of the inclusion of heating systems in Saransk depends on a number of conditions, the main of which are:

  • availability of funds for the timely start of heating;
  • compliance with the timing of repair and maintenance work with the system.

The city administration of Saransk has allocated a decent amount of money for repairs and maintenance of heating systems in 2015, so everything will be ready on time.

Today, 98% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.

Priority of heating supply in Saransk

Traditionally, the first institutions of heat will receive social institutions:

  • schools;
  • children's homes;
  • kindergartens;
  • hospital;
  • nursing home.

After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.

The optimum temperature in a residential building

If you have any doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:

Room Celsius temperature
optimum acceptable
Living spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Driveway, staircase 16-18 14-20
Pantry 16-18 12-22

What to do if the heating was not given to

Find out with whom you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.

By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).
If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.

instagram viewer