How to connect the switch box with a socket

click fraud protection

Connect the unit: one switch + socket

To connect the switch + outlet block, connect the five wires in the junction box.

Circuit breaker and socket circuit

  1. The green color indicated in the diagram denotes the ground cable and blue indicates zero from the distribution point. They are connected to the outlet in the unit directly.
  2. Red indicates the phase that is connected to the outlet, and then to the combined voltage cable of the device.
  3. The remaining two cables are connected to two contacts, which in turn are connected to two lamps and connected by pressing a button in the bathroom.

The device of the device assumes that there are three cables in the outlet: phase, zero and ground, the switch has only a phase connected to the lower contact( zero goes to the lighting device).However, the top of the contact phase will only have after the power button.

Electrical wires in the distribution box are divided into two twisted wires, as in the diagram( yellow and beige color).On the wires with the voltage from the light bulbs similar wires of the switch are twisted. Cables with zero voltage and ground for operation of lighting devices are supplied from the distribution box and the connection connections of the outlet.

Please note! If you want the reverse order to trigger the keys, just swap the yellow and beige cables on the switch.

Installation of the unit with a single-key switch and socket is connected in the same way, only one cable, yellow or beige, drops out. For the operation of the three-key switch, a six-wire cable is required, the additional wire of which will be connected next to the yellow and beige to the third contact.
Switch box and sockets in details

Connection of three or four outlets in the

unit For the installation of several electrical appliances( household appliances, computers and telephones) use a block of outlets located under one distributor.

Installation of several outlets in one unit is carried out in parallel.
Scheme of a three-stage outlet

Before connecting the device, make jumper wires of three wires in each location of the outlet. The size of the jumper should be such that it allows easy, but surely fit in the box.

A block of three outlets is installed as follows:

  1. Analysis of the components of the outlets.
  2. Stripping of power and jumper cables. The wire from the distribution point should be a little with a margin, so that in case of reconnection it is enough for a new sweep.
  3. The first socket, it's distributive, is connected to the mains.
  4. Installing the electrical outlet in the back box.
  5. Connects the second socket during the parallel conductors according to the colors.
  6. Connection of the third outlet: only three cables are connected to it, as for a conventional single model.
  7. Cover the block under the cover with special cuts for each of them.

The result of connecting the outlet

On the video you can see the process of connecting the unit from the socket and the switch.

This completes the installation, success in business!

instagram viewer