5 compulsory steps with which to begin repairs

click fraud protection

High-quality repair - it is competent training. How to plan repairs and where to start? The answer to this and other questions you will find in this article, which presented a unique plan. Because of this you will not be breaking anything in the course of repair.

Repair - it is correct incremental steps to success

Repair - it is correct incremental steps to success. Photo: tomsk.ru

Step number 1. Dismantling of the old finish

This is the first and important step, you want to start repair. But before that, do not forget to bring all things, as they will slow you down.

  1. Remove wallpaper, tile, plaster.
  2. Further it is necessary to dismantle systems of drywall and suspended ceilings.
  3. Remove floor coverings, but only if you'll change them. If you're not going, then nestle a thick layer of the film, then the film and hardboard again.
  4. Remove trims, fabrics and door boxes.
  5. Hide windows, so they do not get dirty.
The first step - dismantling it

The first step - dismantling it. Photo: eremont.ru

Step number 2. The alignment of walls and floors

Once you have completed the demolition work, you need to do the alignment of walls and floors, ie its geometry space. But keep in mind that you need to get the right angles in those places where you plan to put the equipment and furniture, for example, in the kitchen, living room, bathroom and so on.

alignment walls

Alignment walls. Photo: remont-holding.ru

Step number 3. Make a plan of engineering systems

The next step - is the scheduling of all engineering units. This electricity, water supply, sewerage, low-voltage systems and underfloor heating. Also, do not forget to think of an arrangement of furniture, as not all rejoice outlet hidden behind furniture. Another important point - replace heaters or move them to some other place.

Plan of engineering systems

Plan of engineering systems. Photo: skgoldkey.ru

Step number 4. Screed and preparation of the walls with the laying of finishing materials

floor screed

The first thing to do - is to identify the level of the floor on the threshold of the front door, and in each room to make a mark in opposite corners. Note the threshold, if it is higher, then no problems.

The second stage - to determine the type of flooring in each room, and do not forget to be aware of their thickness.

The third and final stage - to make self-leveling floor with different height in each room. Not to forget the performance, it is recommended to take a notebook and write down all the information there.

Screed in the apartment

Screed in the apartment. Photo: pol-pro.com

Preparing walls and laying finishing materials

Firstly, you need to putty the walls and ceiling, and then sanded them with soil. Produce these works 12-15 times in order to get a smooth wall without cracks and stains. Secondly, to complete all painting. Third, do laying finishing materials: tiles, skirting boards, flooring, wallpaper, decorations, and so on.

plaster walls

Plaster walls. Photo: stroyday.ru

Step number 5. dirty work

After the repair is over, you need to start spring cleaning, that is, to throw out the rest of the garbage. Yes, it is not easy, but I'm sure you can do it!

Cleaning after repair

Cleaning after repair. Photo: media.professionali.ru

These were all steps, from which you should start your repair. And now the only thing to do - is to choose a wallpaper, flooring and tiles, fixtures, accessories and other details. I hope that your repair will be faster, but at the same time and quality!

Like this? Subscribe to our feed Yandex. Zen

2017-2018. Copying of materials is possible without preliminary negotiation in the case of a direct hyperlink to our website.

instagram viewer