SHARE
in social networks
This article will help you decide what is best to place electricity meter in the apartment. Here is presented a complete classification of the existing instruments of the type of construction and energy, the number of phases, the charging of these devices, as well as all of the data of their choice and correct installation. The article deals with the most popular models and current prices for them.
Device for measurement of electrical energy
Content
- 1 What is the electricity meter is better to put in the apartment: the classification of the instrument
-
2 What is the electricity meter for the apartment better price, the advantages and disadvantages of devices
- 2.1 Advantages and disadvantages of installation type electronic electricity meter
- 2.2 Why buy an induction energy meter: strengths and weaknesses
- 2.3 Electricity meters: types of designs of phase number
- 2.4 Which is better to put in a flat electric meters accuracy class
- 2.5 Single-rate and multirate Electricity meters: price and features
-
3 How to carry out the replacement of the meter in the apartment
- 3.1 442 resolution requirements of electricity meters replacing
- 3.2 The operating life of the electricity meter in the apartment
- 3.3 How much is the replacement of electric meters in homes
-
4 How to change electricity meters in the apartment: features of the procedure
- 4.1 How to replace electric meters in the apartment: a list of documents
- 4.2 Counters Mercury electricity: prices and reviews
- 4.3 Features connecting single-phase electricity meter
- 4.4 Recommended Installation of accounting equipment
What is the electricity meter is better to put in the apartment: the classification of the instrument
Looking for where to buy a meter for electricity is important to remember that the selection and purchase of the appliance should be carried out taking into account all factors. The device is not subject to return and exchange if there are obstacles to its installation, because the clearance sale is accompanied by the introduction of the respective marks in the passport. This document contains the serial number, as well as printing, delivered state verification.
Electricity meter
replace the old electricity meter a new device in the following cases:
- device mismatch the requirements put forward by the power company;
- device failure;
- settling into a new living space.
Note!There is only one reason for the return of electrical energy meter - the presence of the factory marriage.
Apparatus for counting electrical energy are classified by the following features:
- construction type (mechanical type and electronic or inductive).
- The number of phases (single and three phase).
- Type energy measured (measuring instruments reactive, active energy, as well as universal).
- Tariff (single, double and multi-tariff).
What is the electricity meter for the apartment better price, the advantages and disadvantages of devices
Now the problem is particularly acute, such as the replacement of electric meters, at whose expense to carry out the installation of the unit of concern to many citizens. From a theoretical viewpoint, the measuring devices are included in the area of responsibility of the electricity supply company., na solution to the problem, in fact rests on the shoulders of the tenants living in the apartment or in a private house, which is required by law to be available instrument for accounting consumable electricity as well as to the timely replacement of its non-compliance with the requirements or serious damage.
Currently, the market is full of electric energy meters of various types
In the market there are more than 400 kinds of measuring equipment for electricity. when the task composed to buy electricity meters in the apartment price in this case is of secondary importance.
Advantages and disadvantages of installation type electronic electricity meter
Electronic structures are complex devices whose main task is to convert the incoming signal into a digital data format. The result reflects the mechanical dial or screen.
The advantages of constructions:
- error in readings is very small;
- functionality allows you to keep records under several tariffs;
- percentage of theft of electrical energy is very small.
Note!Electronic design offer extra functionality that allows to buy electricity meter with remote control, increased memory and built-in clock.
Electricity meter Mercury 230 with remote control
Disadvantages of electronic devices such as:
- high sensitivity to sudden changes in voltage on the network;
- high price;
- designs are not very reliable in terms of operation;
- repair is very expensive.
The average price of electricity in this category is between 900-3100 rubles. The cost depends on the structural features of the device and the presence of additional features, as well as from the manufacturer. Before you decide to buy electric meters with remote control, it is necessary to take into account that the remote-controlled device costs three times more than conventional devices.
Prices for counters with remote control (remote control):
device model | price, rub. |
Mercury AM 231 01 380 5 (60) | 8500 |
3F.1T.Merkury-230AM-10-100A 02 380 | 8500 |
3F.1T.TSE6803V (M, W) 5-60A 230V 4PR.M6 (M7) P32 DIN | 8500 |
3F.1T.TSE6803V (M, R) 10-100A 230 4PR.M6 (M7) P32 DIN | 10000 |
In 3F.1T.TRIO 1A4 DB 5-50A 220 / 380V G07 PL.KOR.LEMZ | 10000 |
3F.1T.MERKURY-230AM-03 5-7,5A 380 0,5S | 12000 |
TRIO I 1A4 TV LEMZ | 15000 |
Mercury 230 ART 01 REMOTE | 25000 |
Why buy an induction energy meter: strengths and weaknesses
Electromechanical devices can still be found in old buildings of the Soviet era. a new generation of devices is significantly modified, however, they use the same operating principle. The design takes the form of a plastic box equipped with a viewing window. Through the glass you can see the rotational motion of the disk and the credentials of the electricity consumption.
The meter is equipped with 2 coils creating electromagnetic fields due to the passing voltage. Due to this magnetic flux is driven by the aluminum disk, which affects the wheels, displaying numbers. The rotational speed of the disc in the old electricity meters, as well as in new, depends on the volume of electricity consumption. This is displayed on the device performance.
Note!Obsolete induction unit is gradually coming out of a turn, although they are not without certain advantages.
Induction energy meter
Advantages of induction devices:
- reliability of the operation, a low percentage breakdowns;
- unlimited service life of electric power;
- sudden voltage fluctuations in the mains does not adversely affect the device;
- affordable price.
This embodiment has some drawbacks:
- in testimony often have significant errors;
- Device absolutely immune against theft of electricity;
- apparatus carries out independent electricity transmission readings (Self-propelled records without consumers).
The cost of electricity induction type ranges 750-3300 rubles.
Prices for an accounting induction equipment:
device model | price, rub. |
AGATE 1-1 SOE-52/39014 50-11SH | 1350 |
Mercury 201.5 63289 | 865 |
R5 145 101 CE 88 963 M6 | 1160 |
CE 101 S6 145 M6 88962 | 1145 |
CE-6803V M7R32 147,713 | 3260 |
Electricity meters: types of designs of phase number
On sale there are devices with one or three phases. Buy-phase electricity meter type is necessary in the event that flat powered by a single-phase network, consisting of a 2-wire, with a voltage level of 220 V. In this network the maximum allowable load is 10 kW. This type of accounting the equipment most frequently used in private homes and city apartments.
Note!You can connect the device to the three-phase power supply, however, it will need 3 of the device - for a single-phase electricity meter for each phase.
The price of single-phase electricity meters on average is 870-2700 rubles.
If the make-up at home at the expense of the network with 3 phases and 380 V, it will be better to buy a three-phase electricity meter type. The need to use such a powerful equipment is caused by high energy consumption.
Single-phase and three-phase electricity meters
Most often, these networks feed:
- apartment buildings;
- small production and factories;
- workshops;
- Panel-mounted general purpose.
The average price of three-phase meters is in the range of 2800-3300 rubles.
Wiring diagram of three-phase electricity meter
This type of equipment is used in the private sector, if applicable devices with high power consumption:
- three-phase electric motors;
- electric boilers for heating;
- welders and others. specialized tools.
Price three-phase electricity meters:
device model | price, rub. |
Mercury 230 AM-02 53469 | 2847 |
CE-6803V M7R32 147,713 | 3258 |
Mercury-AM 231 01 82 412 | 3079 |
CE 6803V M7P31 133,281 | 3089 |
Mercury 230 AM-01 35789 | 2847 |
Mercury 230 AM-03 47189 | 2847 |
Which is better to put in a flat electric meters accuracy class
Operation of any equipment is accompanied by some accounting errors with respect to indications. On what class the counter, it depends on the difference in rates. A tolerance of only a few percent of the actual consumption.
Devices for domestic purposes flats have a deviation within 2% on average. In practice, it appears as if the user had spent 100 kW of electricity, then the data displayed counter will be in the range 98-102 kW.
Note!The lower the accuracy (class) in the technical data sheet device, the less error occurs when registered electricity. These counters are much more expensive than others.
The meter accuracy class - this is the maximum allowable error in power measurement
If you determine which is best electricity meters, starting from the index error, it is necessary to give preference to a Class 2 devices. On sale there are several versions of the device with a different percentage of error:
- 0,2-05%;
- 2,5%;
- 1-2%.
Features a selection of devices for accuracy class
power consumer | Accuracy class readings | Class voltage |
electricity producers | 0.5 and above (units equipped metering function by the clock, and to store the information for 3 months). | Without Borders |
Apartment buildings | 1.0 or higher | Without Borders |
Consumers with a power level of 670 kW | 0.5 and above (units equipped metering function by the clock, and to store the information for 3 months). | Without Borders |
individuals | 2.0 or higher | Without Borders |
Consumers with a power level less than 670 kW | 1.0 or higher | Up to 35 kW |
0.5 or higher | 110 kW |
Single-rate and multirate Electricity meters: price and features
The appearance on the market of electronic devices, the system consumed energy accounting data has significantly changed. After the installation of the meter in an apartment, you can now maintain records across multiple billing. Modern devices are able to maintain a 2-3 rate, and some models - and more.
How much are the counters for electricity: prices chetyrehtarifnyh devices:
device model | price, rub. |
Energomera CE R5 102M 145 253295 J | 2320 |
EKF Scat 105E / 1-5 (60) TOI4 10501 | 2775 |
The basis of the multi-rate meter is split time accounting. For example, power consumption of the daily count rate starts at 7.00 and ends at 23.00. Countdown night charging mode starts at 23.00 and ends at 7.00.
Useful advice!The cost of electric power consumed during the day, is significantly higher than at night. All energy-intensive inputs such as washing can be scheduled at night to save money.
Price of electricity meters day / night is much higher than conventional single-rate. But not all apartments have a significant difference between the cost of electricity during the day and night, so the cost of the purchase of multi-rate equipment can not be recouped. Before purchasing costs to produce cost estimates broken down by day / night and to compare them with the results of a single tariff.
If the economy reaches 35-50%, it is safe to perform the replacement of the meter in an apartment on multi-tariff, if the difference is only 100-200 rubles., That such an acquisition would be impractical.
How much are electricity meters for apartments: prices single-rate instruments:
device model | price, rub. |
AGATE 1-1 SOE-52/39014 50-11SH | 1350 |
Mercury 201.5 63289 | 865 |
Mercury 230 AM-02 53469 | 2845 |
R5 145 101 CE 88 963 M6 | 1155 |
CE-6803V M7R32 147,713 | 3260 |
How to carry out the replacement of the meter in the apartment
the current generation of devices more advanced than the older models, because they are considering a sufficiently large amount of electrical power, eliminating the appearance of serious problems:
- fluctuations;
- failures;
- circuit and fire.
442 resolution requirements of electricity meters replacing
According to the updated decree №442 changed market control rules with the retail sale of electric energy. The document prescribes that the transfer of readings of electricity meters used by citizens of the Russian Federation should be perform using only electrical appliances, with the minimum allowable accuracy class of devices – 2,0.
Modern instruments have a high enough accuracy class
Note!If the accuracy of the device class is less than the allowable value, should be carried out replacement of the meter. Such devices can be used for a statement to his life or to serious damage.
Once issued a decree №442, electricity service life corresponds to the duration of the interval mezhproverochnogo - 6 years. This means that the device can be used inappropriately to the first inspection by the authorities, then it must be replaced. To date, the production of devices with accuracy class less than 2.0 stops. the repair is also not allowed.
On the one hand, the accounting-change procedure is designed to increase the security of electricity use, on the other - there is a question, at whose expense involves the exchange of electricity. In view of Article 221 of the replacement payment is done by the owner of premises.
Payment replacing the meter by the owner of the apartment
There are circumstances in which the payment is made by the municipal service. This applies to those contracts obtained by the installation of electricity meters in an apartment where there is a corresponding mark, otherwise the owner of your own covers all costs.
Related article:
voltage regulators for home: Reviews. What is better to choose a converter.What is better to choose the device? The main characteristics of the devices. Review of current models. Repair and maintenance of rectifiers.
The operating life of the electricity meter in the apartment
Operational life of any device prescribed in the data sheet. During this period, provided the correct settings and the absence of violations of rules of operation, the device keeps a record as accurately as possible energy expenditure. Therefore, all the data collected during this period, can be considered definitive.
To check the life of the appliance, just look at the datasheet. There is a mark showing the first check counter, made in the factory of the manufacturer. Most often, the equipment is considered to be fit for 25-30 years, after which you must replace the unit.
The counter should correspond power amperage which extends in electric
Terms of replacement of electricity meters installed in the apartments after a routine inspection of the device:
- If there is a flat counter accuracy class 2.0 or 1.0, the calibration routine of electricity is performed every 16 years. In the process control can be detected the error and any wrongdoing. Then metrological service will recommend to perform replacement of equipment. The average service life of such devices - 32 years.
- In the presence of the device class accuracy 2,5 property owner is obliged to carry out accounting replacement equipment after the timing of its service data sheet. The signal for replacement may also serve as the detection of errors in operation of the device.
Note!Law passed in 2012 year, it requires that all user classes 2,5 device should be replaced devices marked 2.0 or 1.0.
Replacement power control devices is carried out by specialists
How much is the replacement of electric meters in homes
All installation procedures must be performed accounting equipment highly qualified specialists. Work with electricity is extremely difficult and dangerous. Electrician must be entitled to exercise and unsealing zaplombirovanie counter. Not allowed to use the services of private companies, however, should find out in advance whether the master has a permit. Otherwise, such actions may be illegal.
The cost of single-phase multi-tariff electricity meters Mercury - 1280-1400 rubles. Price of similar single-rate devices is in the range 670-700 rubles. To this is added the cost of service to dismantle the old device, the installation of new equipment and its wiring.
Installation of electricity meters in the apartment: in the service price:
Name of service | price, rub. |
Installing Single-rate equipment | 1500-2000 |
Installation of single-phase multi-rate equipment | 1500-2000 |
dismantling device | 500 |
Installing a three-phase equipment with direct inclusion | 2500-3000 |
Installing / replacing equipment on a support / column | 5000-7000 |
Removing the device on the support / column | 35000 |
How to change electricity meters in the apartment: features of the procedure
Replacing accounting equipment, as well as its service, is one of the responsibilities of the landlord, where the meter is located:
- If the appliance is installed in the common corridor or on a common platform, it acts as a public property. In this case, the meter expiration dates, as well as its timely replacement, controlled Partnership Homeowners, the management company or the owner of the building, if it is owned by the organization or municipality.
- If the appliance is installed inside the store room or apartment, the entire responsibility for his condition and replacement rests with the owner.
Note!If the contract with the tenant of the apartment stated that the obligation to install an accounting of equipment assigned to the electricity supply company, the latter produces a procedure for a fee or allocates the amount of funds already made (depending on the contract).
Do not attempt to carry out work on the meter replacement
How to replace electric meters in the apartment: a list of documents
For tenants of apartment buildings provided a specific procedure for replacing electricity:
- Complaints and applications.
- Providing the necessary documents.
- Drawing up the act.
- verification procedure meter.
- Oplombirovka device and issuing an act confirming this.
All documents drawn up in accordance with the norms prescribed for them by law.
All required documents should be completed carefully
The information that is displayed in the statement:
- Document's name.
- Date and place.
- The name of the applicant and its data (phone number, email and address).
- Address of the property, which will be the replacement of the equipment.
- The demands made on the new device.
- Essential elements assigned to the contract power.
To apply need a standard set of documents provided by the procedure:
- Document establishing the identity of the property owner where the counter needs to be replaced is set.
- The power of attorney, if the submission of an application made by the representative of the property owner.
- passport with stamps confirming the registration.
Replacement counters made after the decision of the competent authorities
Note!After consideration of these documents, the competent authorities to decide whether to make replacement equipment. As a result, between the performer and the applicant signed by the replacement certificate.
The data recorded by the act:
- Place the installation of a new accounting unit.
- Address where is located apartment building.
- Technical data devices to be replaced (the date of manufacture, type of device, its number, it is necessary submit readings of electricity meters at the time of the act).
- Technical data of new devices.
- Date of installation of the new equipment.
- Name jur. surrogate equipment.
After repair, inspection or replacement of the old counter invites representatives and sales
Specialist fills all the fields of a document in two copies, one of which sends to the applicant.
Counters Mercury electricity: prices and reviews
The most popular manufacturer of equipment for the accounting of electricity on the market is the company Incotex. Electricity meters Mercury 201 - the most popular and best-phase equipment type. This category of devices aimed at keeping active energy.
The price of single-phase electric meters Mercury 201 (one tariff devices):
device model | price, rub. |
Mercury 201.5 63289 | 863 |
Mercury 201.6 83665 | 1577 |
Mercury 201.6 83665 | 1180 |
The price of single-phase electric meters Mercury 200 (dual-rate instruments) | |
Mercury 200.02 (R) | 1394 |
Mercury 200.04 (M) | 3089 |
Mercury 200.05 | 1771 |
Note!Rates for electricity meters Mercury 201 and 200 listed in the table may differ from the actual data. The exact value depends on the company engaged in the implementation of accounting equipment.
Below are reviews submitted by customers electricity Mercury 201 reviews with forums:
"I have a counter located at the entrance. The device worked fine, not a problem until it started to come receipt with large sums. It turns out that you need a device has long been replaced. As I said, the testimony of obsolete equipment are considered according to the standards of electricity consumption per person without a meter. Most of the neighbors were shaped Incotex device, and I decided to stay at the Mercure counter. A closer look revealed that the body is made entirely of plastic. This means that the appliance is completely safe. Numerical data on the dial can be easily seen. In general, I'm happy with my purchase, although the old counter suits me perfectly. "
Victoria Bendas, city Moscow
Mercury electricity meters
"When it came time to change the counter, I bought a single phase on the advice of experts - Mercury 201. The device is safe and reliable. I have not revealed deficiencies in six months of operation. "
Eugene Doroshenko, city Yekaterinburg
Features connecting single-phase electricity meter
For most models, instrumentation wiring diagram of single-phase electricity meters directly identical. Single-phase equipment is equipped with 4 terminals, which is typical for this category of devices. Connect to the electrical cables.
setting rules of single-phase electricity meters type:
- Terminal №1 - the entrance to which is attached the phase wire.
- Terminal №2 - output for connection to el. the wires leading to the apartment.
- Terminal №3 - input designed for the neutral conductor.
- Terminal №4 - output, to which is attached the neutral conductor.
Wiring diagram for single-phase energy meter
If you examine the scheme in detail, explaining how to connect a single-phase electric meters, this procedure can handle even the owner of the apartment. In most device manufacturers instructions in place on the inside of the box.
Note!With self-connection is required to contact the power company to remove the seals and install it on a new device. Non-sealed device not allowed to operate, so installing the seal should be as soon as possible after the counter is checked and connected.
To secure the e-mail. wires to terminals of the device, it is recommended to use a screw mounting method. Terminals, which are outputs, current is passed to valves and protective elements. general-purpose terminal "phase" provides for the neutral wire to RCD (Protection) and fuses. For this reason, it is more efficient to install all applicable devices in a single panel.
Special protective shields increase the reliability of the device and the additional locking devices. Optimal panel mounting level is 170 cm above the floor. To counter was easy to use, this indicator is calculated on the basis of the owner's growth.
After examining the instructions electricity meter can be connected independently
Recommended Installation of accounting equipment
In order to seamlessly install electricity meters, experts recommend to use the appropriate tool:
- forceps;
- pliers;
- pliers for removing insulation from wires of the protective coating.
Before performing any work necessary to make sure that the lead-in was available. It should be turned off at a time when all the work will be carried out, so the operation should be safe and painless.
Be sure to follow all safety rules, qualitatively insulate all wire sizes and extremely attentive to the implementation of each action. You also need to take care of getting permission from the supervisory authorities and to have available the necessary documents.