Cupboard with his hands how to make furniture unit for the kitchen?


Kitchen - face each family, a reflection not only of cleanliness and order, but also its comfort, quality of design and aesthetics. The well-equipped room cleaning takes place every fun, easy and fast. This approach is explained by the presence of the required set of household appliances, a minimal amount of furniture, where each attribute has its place, and set fits exactly in the kitchen space. Getting filling this space, many people opt for integrated design solutions, however, these kits are rather high price, and they are unlikely to fit perfectly under the area premises. And to understand "how to make kitchen cabinet with their hands" is a snap.

Content

  1. What you need to know before you start work?
  2. The optimal choice for the cabinet material
  3. Drawing up of the future cabinet of the project
  4. The first steps towards a new cupboard
  5. Tools required for installation
  6. Major work on the assembly of cabinet

What you need to know before you start work?

Depending on the external signs, all kitchen cabinets

There are outdoor and attachments. The latter samples may have common or angular disposition, open or closed form. Regardless of the structural difference, cabinets assembly principle remains the same.

Some advice of professionals will allow for the installation correctly and avoid common mistakes:

  1. Fully equipped kitchen, where you want a corner cupboard, in need of a precise selection of the door. Its size must match the dimensions of the surrounding structures. The flap is made of the same material or another corresponds to the total façade.
  2. Avoid unnecessary expenditures will allow the restoration of the external appearance of the furniture by replacing the external elements, countertops, doors, base cabinets. Such repairs will cost three times cheaper.
  3. The top mounted kitchen cabinets are ideal for masking do not decorate the room details: counters, compact boilers, exhaust elements. The interior space is used most efficiently: made shelves, compartments for tools.
  4. Get the perfect cut of the material at home is unlikely to succeed, so help better apply to the carpenter's shop or hardware store. As a result, the interior space is filled with the details of impeccable form, and the kitchen upgraded significantly.
Drawing cupboard

The optimal choice for the cabinet material

Assembly kitchen cabinet involves the use of a certain range of materials:

  • Chipboard maximum waterproof coating for manufacturing the carcass worktop. The processing end portions and filling furniture surfaces lengthens the life of the detergent significantly basis.

This material was 16 mm in thickness is considered optimum one for the cabinet, it is easily cleaned, it has an attractive external data and is quite inexpensive.

Any particle board, despite the humidity, requires edging. To this heated iron to medium temperature, the adhesive part is fixed on the rim of the cabinet surface, and then heat the iron to iron on the end portion. Dry cloth tightly pressed against the film edges, protruding parts very carefully cut with a knife. Sandpaper fine fraction is treated with ribs cabinet parts. It is important to show the reasonableness and not leave chamfers.

  • Finishing doors and facades enclosure requires the use of any type of veneer, laminate or melamine.
  • MDF different types with matte, lacquer-coated or laminated.
  • Natural wood trim elements external cabinet doors, allow cheaper Floor installation box, which is inserted into the middle of the decorative veneer or plywood. Wood needs protecting special impregnations and water-repellent finish.
  • Multi-coated multiplex is very strong, it does not warp or swell.
  • For the manufacture of internal shelves using one of the cheapest materials - plywood.
  • cabinet door trim glass ruggedized which carefully treated edge and mounted in a wooden or plastic frame.
  • The elements made of PVC or acrylic is used as an additional start decorating.
  • Exterior finish or wood veneer cabinet will give a respectable and noble appearance. Otten coating may stain or special varnish applied in several layers.

Kitchen Cabinet

When choosing the material for the outer facades of cabinets, it is taken as a reference to style kitchen, interior color palette and set furniture.

Reduce the cost of a single product assembly process will allow the purchase of scraps in the carpentry workshop, then the construction cost will be cheaper by half.

You can resort to such an option: to provide schemes for the organization making the cut necessary parts, then you can self-assemble cabinets.

Drawing up of the future cabinet of the project

The most important point of all the work is considered to be proper preparation of the drawing. Careful study of this question eliminates future errors, time-wasting in their trouble. Kitchen cabinets are designed for long-term use, so it is important to take responsibility for planning time.

If you never had to make drawings, you can get information from books, periodicals, in the global network. To carry out the work correctly, consistently and clearly let some expert advice.

Drawing cabinet for built-in oven

Having understood the principle of work, you need to copy found an option to make their size. Special artistic skills in the preparation of drawings is not required: it is necessary to take a clean sheet, a pencil and a triangle. Schemes require maximum accuracy of measurements to 1 mm.

In the drawings, all parts of the kitchen cabinet should be labeled, there is no sense to plot parallel to the surface, except in cases where their bases are made of different materials. The dimensional accuracy of the product is especially important for home cutting surfaces, even a minor error in the 2-3 mm can ruin all the work. Also considered a method of assembling, the thickness of the rear wall.

All floor cupboards have a peculiar structure: their lateral parts are moving in the legs. Therefore, during installation it is important to take into account the unevenness of the floor and the lower shelf is desirable to place a little higher. Hollow space closed socket, which is located between the side members. any Outdoor cabinets for kitchens require manufacturing countertop or work surface. The doors will not knock during closing if the internal shelves will be slightly less than the frame.

The depth of the cabinet is defined by the spatial possibilities for accommodation. In the manufacture of products in a single copy are guided by the size of standing furniture. The basis of cabinet furniture assembly put a sequence - mounting legs, doors, hinges, handles.

Assembling kitchen cabinets

The height of the kitchen cabinets varies depending on the markings located in the equipment room - stove, table, fridge. The doors of such structures should fit snugly to the ground and avoid distortions. At the initial stage it is important to consider the number of holes, hinge pins, pens. The metallic elements are selected in a specialty store.

Such mounting components as glue, impregnation, lacquer are selected carefully. Cheap cover perishable emit unpleasant odors and are absolutely not suitable for use, to whom the same foods actively absorb unpleasant fumes.

The first steps towards a new cupboard

What action should be taken first?

  • Mark the exact location of the future cabinet.
  • The calculation of the total value of the product, the size of some of the design elements. All indicators, including the number of shelves, the distance between them is marked on a sheet of A4 size, it will provide better visibility.
  • Initially chosen color of the cabinet. Traditional shades considered imitating natural wood coating type oak, beech, alder and maple.
Kitchen furniture made of wood

Tools required for installation

The presence of the full range of tools allows you to do a first-class cut. If this is not set, it is advisable to send the elements to trim to a special workshop and assembly to produce on their own. What do I need?

  • jigsaws;
  • screwdriver;
  • router;
  • stapler, staples;
  • screwdriver;
  • loop for hanging doors;
  • plugs, screws, brackets for shelves;
  • glue;
  • tape measure, a pencil;
  • building area;
  • emery cloth.

Major work on the assembly of cabinet

Once the elements of the future cabinet will be ready, they can be placed in a specific order and number. Facilitate the assembly process, marked with arrows inside structure denoting the order of mounting parts. Then holes are made under the holder for shelves. On the inside of the cabinet door to the designated place of fastening of loops, it is deepening for them to do this, take a special nozzle for round holes.

The circuit assembly of kitchen floor pedestals

Shkantovye connection greatly simplifies the process of assembling the cabinet, used for mounting a flat cutter, which are pasted these same elements. As a result of contact with the adhesive, they increase in size, providing a tight grip, becoming practically unnoticeable. It is better to err and to score a dowel until it stops. Then, the item is placed into the hole perpendicular to the plane of the free spaces between them are glued carefully. In this way, the main frame is going enclosure, it is further fixed konfirmat plugs and cover.

Attention! If there is an urgent need, you can use ordinary nails.

  • After the erection of the frame is attached a rear wall. It makes furniture unit tougher, does not warp design, fix a plywood sheet stapler. Curtain products, equipped with lighting, must have holes for wires. Further, checking perpendicularity of corners, a rear wall put in grooves milled and attached straps.
  • To ensure reliable fixation wall cabinets wall allow metal angles, which take the size of the screws 4 x 15.
  • An important point of all the work is to mount the doors. Loop necessarily regulated, round holes make special drill, keeping a distance of 8-10 cm from the edge.

It is important that prosverlivaya holes should be especially careful to avoid the through hole. On the side of them do advance, even before the commencement of works. At this stage it is necessary to comply with the maximum precision in size, to avoid discrepancies.

Tractor-mounted cupboard

After setting the first cabinet hinges verified its flatness and second screwed. Initially, the fastening element is fixed to the door, whereupon amplification and hanging is made on the side walls. Ready cupboard hanging on the wall, is inserted into the shelf space. Installed hinged structure connected to each other, providing maximum reliability of fastening, and they will look much better. For this purpose, screws or special ties.

Outdoor kitchen cabinets should have a base with a much greater depth than the door. It is attached to the base of the pins at the time of assembly of the body portion.

The information set forth above, allow any inexperienced webmaster to easily cope with the kitchen cabinet assembly process. Good luck in your work, accuracy, patience and effort!

1 Star2 stars3 stars4 stars5 stars (34 estimates mean: 4,65 of 5)
Loading...

instagram viewer