How to make a box of drywall in the bathroom: video-installation instructions with their hands, price, photo

click fraud protection

How to make a box of drywall in the bathrooms used tools and materials, project and installation

X

Table of contents

  • 1 Preparatory stage
    • 1.1 Tool
    • 1.2 Project
    • 1.3 Material
  • 2 Mounting
  • 3 Output

The bathroom is a room with high humidity and sudden changes in temperature. In addition, there is a large number of devices and applications that require connection to the water supply and sewerage systems.

That is why the question of how to make a box of drywall in the bathroom to hide the pipes, very popular among novice masters.

Box in the bathroom, tiled

Box in the bathroom, tiled

Preparatory stage

All installation boxes is a phased implementation of the works, which are closely linked and require strict compliance with the instructions.

Tool

We need:

  • percussion drill or a hammer;
  • Screwdriver or screwdriver;
  • water level and plumb;
  • roulette;
  • Mounting the knife;
  • putty knife;
  • Metal scissors;
  • pliers;
  • hammer.
Tool kit for work with plasterboard systems

Tool kit for work with plasterboard systems

Project

At the heart of the creation of any design project lies. It is a detailed drawing of placement to create the box profiles.

It should be noted that each case is an individual.

  • Box of drywall for bathroom is best to equip a small technical hatch. Therefore, in places it is necessary to make landfall strengthening of the profiles, if necessary, set the loop. (Cm. also the article How to plaster plasterboard with their hands.)
  • It is recommended to make the holes through which the air will flow in. This is in order to avoid condensation on the pipes.
  • Schedule frame assembly can be virtually any type of profiles, but the finished construction should be sufficiently strong and reliable.
  • On this project should be noted all types of connections.

Tip!
All profiles mounting scheme must perform to scale, in order to correctly calculate the distance between the parts.

Project option box located under the ceiling

Material

Since the box for the bathroom plasterboard will be continuously exposed to moisture and temperature changes, the choice of materials must be approached very carefully.

  • Plasterboard for vlagoottalkivayuschey should possess properties. Learn the material can be the characteristic green color. He tolerates moisture and well proven in the decoration of bathrooms, kitchens and even in some types of outdoor works. (Cm. also the article Decorating the living room with plasterboard: species).
  • Special attention should be paid to the primer. Under these operating conditions is better to choose a mixture with a high content of the antibacterial component and a high degree of penetration.
  • Profiles can not be replaced by wooden slats. They are unstable in a humid environment, and an attempt to protect them from external influences only increases the cost of the material, which again returns to the masters of the use of profiles of metal.
Moisture resistant gypsum board

Moisture resistant gypsum board

Mounting

Installation instructions with their hands:

  • On the wall is applied to marking in accordance with the prepared project. Check the evenness of line level. (Cm. also the article How to hang wallpaper on drywall with his hands)
  • Next, install guides, fixing their shock dowels.
  • Then you need to install the bearing elements, so they formed the shape of a box. On the provided photo shows several variants of such structures.
Option boxes with floor insulation for pipes

Option boxes with floor insulation for pipes

  • All the elements are fixed to each other by special screws, which are called "flea". You can also use a variety of additional mounting elements or suspensions.
  • Once the frame is ready to begin the installation of the hatch or door. If the installation is made with their own hands, the moving part immediately fix a piece of drywall, which will be a little beyond the edge of the door. Thus, it is possible to provide even greater contact and mount the lock mechanism in the simplest form of a magnet.
  • Before installation duct insulate pipes of hot and cold water to avoid condensation. This is typically done using the mineral wool.
  • In the final stage the installation of all sheets of drywall, which are subsequently treated with primer and shpatljujut. In this process, use the reinforcement tape and perforated corners. The price of these items is small, its benefits - is invaluable.

Tip!
Before starting the installation, make sure that the element opening the door or hatch is reliable and will work correctly, because this site is the weakest in the whole structure.

View of the installation boxes

Output

Creation of gypsum boxes is simple and at the same time responsible process. It requires special attention in the design and continuous monitoring of the installation. In order to more accurately understand the technological and practical issues on our website provides detailed photo and video instruction, in which you will find the necessary information on the question.

instagram viewer