When they give heating in Nizhnevartovsk in 2015

click fraud protection

How does Nizhnevartovsk prepare for the heating season 2015?

Absolutely all objects of social sphere and housing facilities should be prepared for the winter, when they turn on heating in Nizhnevartovsk. While preparation for heating starts to go according to the plans. The percentage of city preparation for the supply of heating is more than 95%.

In Nizhnevartovsk replaced more than 10 kilometers of engineering networks

To date, work has been completed to replace the dilapidated utility networks, 20 boiler rooms out of 22 are fully ready for the supply of heat, and repairs have been almost completed on heating networks. In apartment buildings more than 85% of heating systems have been crimped. This year, many management companies are coping with the tasks quickly, faster than last year.

When heating is provided in Nizhnevartovsk, all boiler rooms must be ready for the heating season. Today, the complete readiness of CHPP-3 and CHPP-2 is demonstrated. Particular attention is paid to the preparation of centralized systems of heat, water, and sanitation.

Residents of Nizhnevartovsk are waiting for the beginning of the heating season

When heating is due in 2015, it will be the first to receive objects of social significance, and a little later, heat will be delivered to residential buildings. The exact date of switching on the heating is unknown and therefore the residents are concerned. After all, over the past few days, the temperature has dropped significantly.

What does the heat supply schedule depend on?

The timing of the inclusion of heating systems in Nizhnevartovsk depends on a number of conditions, the main of which are:

  • availability of funds for timely start of heating;
  • compliance with the timing of repair and maintenance work with the system.

The city administration of Nizhnevartovsk has allocated in 2015 for repair and maintenance of heating systems more than 61 million rubles.

Today 95% of consumers are prepared to start heating. Repair and preventive measures are carried out exactly in time.

In Nizhnevartovka there is a check of the thermal equipment

Priority of heating supply in Nizhnevartovsk

Traditionally, social institutions will receive the first heat:

  • schools;
  • kindergartens;
  • of the children's home;
  • hospital.

After they are provided with heat, heating systems will be launched in residential buildings. The latter will connect to the heat of industrial premises.

The optimum temperature in a residential building

If you have any doubts about the quality of housing services in heating systems, make a temperature measurement in the premises of the apartment. The following parameters should be optimal for SANPiN 2.1.2.1002-00:

Room Celsius temperature
optimum acceptable
Living spaces 20-22 18-24
Kitchen 19-21 18-26
WC 19-21 18-26
Bathroom 24-26 18-26
Corridor 18-20 16-22
Driveway, staircase 16-18 14-20
Pantry 16-18 12-22

What to do if the heating was not given to

Find out who you have a contract for the supply of heat. It can be either a management company or a heat utility directly. There you can request that you perform a clearing for improper provision of the service.

By law, heating can be turned off for a month for 24 hours( total for all days).At the same time, there can be no more than 16 hours of continuous heat( if in residential premises +12 and above), no more than 8 hours( if at home 10-12 degrees of heat) and no more than 4 hours( if the temperature is 8-10 degrees).

If these general rules are not met, for each hour of failure to provide services( the total amount for the entire period), heating fees will decrease by 0.15%.

instagram viewer