Installation of drainage system - we do calculations and fastening ourselves

click fraud protection

Installation instructions for gutters - consider the object of work

These systems include a large number of elements, which, depending on the design concept, can both be absent and take the most unusual forms. The complete set includes: a hanging pendant and deadlock, a knee, a drain, a vertical pipe, a mark and wall fasteners.

Each part of the system performs a certain function. So, water, draining directly from the roof into the gutter with limiters from overflow, falls into the funnel. It is an important element for the further transfer of water into the drainage system. If necessary, the direction of the flow can be changed with the help of a knee, one of which is considered a drain. It is attached to the end of the vertical pipe and serves to drain water from the system.

The installation instructions for gutters require fixing with special tools. For pipes, this function is performed by a yoke, and for gutters - a hook with a seal. When the edge of the chute is to be limited, stubs are used. As for the joints, they can be made using connectors or tees.

Installation of the drainage system with our own hands - perform calculations

Installation of gutters must be carried out under the project and using all the necessary tools. The main requirement for the project is the correspondence of the number and dimensions of all components of the system to the size of the roof and the amount of precipitated precipitation.

The first step is to figure out how to calculate the drainage system. At the initial stage, you need to determine the diameter and number of basic elements, which directly depends on the roof area( per 100 m2 - 1 drain pipe) and its slope, while achieving an even distribution of water throughout the system. After this, you can determine the number of funnels, for each pipe only one is required.

Gutters are three- and four-meter. The required amount is calculated in accordance with the perimeter of the roof, and according to the data obtained, the need for connectors is calculated( 1 piece per 2 troughs), hooks( 1 piece per 60 cm length) and plugs( for each end system).This calculation of the drainage system , especially its slope, directly depends on the length and number of turns of the system.

Clamps for fastening and elbows also need to calculate their number, which depends on the number of pipe joints and drains( 1pc per riser), respectively, and the clamps should be installed from each other at a distance of 180 cm. Here, the calculation of the gutteralmost finished.

In order to assemble a drainage system with your own hands, it is necessary to know exactly which tool to use. Prepare worth a tape measure, pencil, ruler, screwdriver, hammer, nails, screws, twine, hacksaw, file, the device for bending brackets and glue with sealant.

Installation of drains - stages of operation

assumes installation instructions for drainage system, the system assembly process is carried out in stages. First of all, the line for passing the future trench is determined by twine and the hooks are installed in steps of 60 cm for fixing it strictly horizontally or with a slight inclination, with a distance of 15 cm from the end hook to the roof. To do this, the bracket should be carefully bent so that the rear edge of the trough is 2 mm above the front.

The next stage is the preparation of a gutter of the required length. The cut must be done by a hacksaw, and the cleaning of the edges by a file. Its segments are connected by locks, the design of which involves applying a special formulation to seal joints. The distance from the connection point to the bracket should exceed 10 cm.

The plugs are then mounted by gluing their inner part with an adhesive strip of five millimeters thick. At the same time, it is necessary to observe a distance of 2.5 cm from the plug to the side of the roof. Next, in the places where plums are to be found, the funnels are cut in, taking into account the calculated distance between the pipes.

And it is from these points and the suspension of the gutters begins on the brackets, after which its joints must be closed by couplings, and the turns are mounted on the marks.

After the operations from the funnel down the drainage system is started, the video of which you can find at the end of the article. The connection of the segments is done by a coupling, and the fastener to the wall after 150 cm - with a clamp, with the use of dowels and screws, without glue, with the gap from the wall to the drain being no more than 8 cm.

If necessary, the tees are installed as described above. Further, the branch is glued at a distance of at least 30 cm from the ground. The lower part of the drain can be cut to the level of the wall to give aesthetic design.