How to start repairing an apartment. Stages of apartment renovation

click fraud protection

Contents

  • 1 How to start the first stage of apartment repair - ceiling
  • 2 How to start the second stage of apartment repair - walls
  • 3 Repair cost, approximate estimate for work on the apartment
    • 3.1 Average cost of construction work in the apartment

How to start repairing an apartment When mentioning the repair of the apartment flight of your thoughtsis limited to the picture of demolition of partitions and replacement of windows? No problem. Today, you will be able to get a brief combat plan under the name " Stages of repairing an apartment purchased on the secondary housing market ".Now you definitely will not be tormented by the question of how to start repairing an apartment with your own hands, and with the help of professionals. With the first option you will help our site, dedicated to self-repair apartment. So, let's get started.

How to start the first stage of apartment repair - ceiling

Repair of the ceiling is the most urgent topic for many tenants who purchased an apartment in the secondary market. After all, most new owners have to deal with a whole series of "ceiling problems" every day, starting with crumbling plaster and ending with cracks in the ceiling.

How to start repairing the ceiling? Performed for the same simple scheme, as repairing walls and floors, - dismantling, leveling, painting / whitewashing.

As a rule, water-dispersed paint is most often used for the coloring of ceiling coverings, in older houses there is also lime whitewash, more rarely - oil or alkyd enamel. Surely you are tormented by the question, how do you wash away this "beauty"?

Remember: lime whitewash can be washed off with water. The work is very painstaking, but on the quality of performance depends on how well the new coating will lie. If the former owners tried with all their heart and put several layers of whitewash, then you have to arm yourself with a steel spatula and a basin of water. In principle, the same tools will be needed for the operation, code-named "Removal of oil / alkyd enamel or water-dispersed paint."

The next stage in the course of the preparatory work is the leveling of the ceiling. On how accurately and accurately you perform this operation, the appearance of the ceiling and its reliability in the future depends. If you want to make a modern, beautiful ceiling, then see the article on the ceiling of gypsum plasterboard with your own hands - detailed instructions for installation with photos and video materials. Now we will continue to answer the question of where to start and how to finish the work.

First of all, it is necessary to determine the ceiling level difference to know how thick a layer needs to be applied. If the deviation is less than 50 mm, then your reliable assistants will be a primer and putty. If there are cracks on the surface of the ceiling, they must first be expanded with a spatula, and then cleaned and primed.

Remember: on how well the primer is made, the strength and longevity of the ceiling depends. The deeper the primer soaks, the better. Similarly and with putty. On how well the putty works, it depends how smooth the ceiling will be.

The main function entrusted to the primer is impregnation of the concrete surface in order to ensure a reliable and strong adhesion of the entire surface and the layers deposited on it. Accordingly, putty is responsible for leveling the surface and eliminating small defects.

The final chord in the galaxy "where to start repairing the ceiling coating," is directly whitewashing and painting the ceiling. Acrylic, latex, silicate, silicone paints and which paint is best to choose. Even this does not end with a list of products in the building store, which will help you draw a final line under the repair and overhead work. See which paint to choose for the ceiling, depending on the needs.

Repair of ceilings is a rather difficult and time-consuming exercise, requiring patience and meticulousness. Only with the right approach can you achieve the desired result - a snow-white, smooth and strong ceiling, which will please you for a long time. However, the burden of caring for the repair of the ceiling can be shifted to the shoulders of professionals from construction companies. If you have noisy neighbors from above, then you need sound insulation of the ceiling in the apartment, you can do it by yourself.

Flooring substrate Sheathing Primer
Description of work Unit.amend. Price, rubles
1. Flooring
1 Removing linoleum, carpet( without preservation) 1 layer 100
2 Removing hardboard, plywood( without saving) 1 layer 90
3 Removing wooden / plastic skirting boards( without saving) PM 40
4 Removingparquet / laminate( which is laid in a floating way, without saving) 165
5 Removing the parquet / laminate( which is laid on the glue and nails, without saving) 215
6 Removing the screed( up to 50mm) 240
7 Removing the screed( up to 100mm) 300
8 Dismantling log 120
9 Deinstallation of wooden floor( without saving) 275
10 Dismantling of tiles 120
11 Dismantling of reinforced concrete skirting boards lm 100
12 Dismantling of floor granite slabs( without preservation) 360
13 Jointing in tiles 100
14 Installation of lighthouses on the floor n.m 70
15 Backfill of expanded clay for screed 100
16 Warming of floor with expanded polystyrene 165
17 Cement-sand screed to 50mm 420
18 Cement-sand screed from 50mm to 100mm 650
19 Reinforcement of screeds of metaloh mesh 60
20 apparatus finishing screed self leveling mixture 295
21 apparatus sex waterproofing( mastic) 190
22 floor waterproofing apparatus( roll) 290
23 Primer cement screed betonokontaktom 60
24 Primer cement screed acrylic primer 30
25 Flooring and plywood cutting for glue 230
26 Decking and cutting of plywood for bituminous mastic 240
27 Grinding of plywood 130
28 heat / sound / m² based waterproofing 50
29 laying wooden lag rm 100
30 Laying commercial linoleum 300
31 provarkoy joints in commercial linoleum rm 60
32 Laying linoleum flooring 200
33 m² carpet 190
34 Laying cork coatingon the floor 360
35 Laminate flooring 350
36 Hardwood flooring 300
37 Parquet flooring 90
38 Parquet flooring floating 400
39 Parquet flooring for glue 500
40 Single parquet laying( in squaring, herringbone) 900
41 Solid wood flooring with floating method 600
42 Hardboard flooring for adhesive 700
43 Adjustable flooring device 500
44 Floor painting 160
45 Floor varnishing 200
46 pvc) lm 150
47 Painting of wooden plinth lm 50
48 Masonry of ceram.tiles of the standard size( 20 × 30,40) 840
49 Masonry of the Keram.tiles of the standard size diagonally 900
50 Masonry of keram.plit less( 20 × 30.40) 960
51 Masonry of keram.plit less( 20 × 30.40) diagonally 990
52 Masonry of ceramic granite 1 500
53 Masonry tile laying, orcomplex pattern( price from) 1 300
54 Grouting( mosaic) 250
55 Grouting of stoneware tiles / porcelain tiles 180
56 Tiled with 45 degrees lm 495
57 Cladding of stairs with ceramic tiles 1 050
58 Masonry keram.bordyr, plinth, ornament lm 240
59 Assembly of metal padding lm 120
60 Floor covering 80
2. Walls
61 Removing old wallpaper of 1st layer 70
62 Cleaning walls against water-based paints 170
63 Cleaningwalls from non-aqueous paints 200
64 Dismantling of tiles 150
65 Cleaning of walls from putty 180
66 Dismantling of the ventilation grille unit. 100
67 Dismantling of plaster 235
68 Dismantling of brick walls( 1/2 bricks) 285
69 Dismantling of brick walls( 1 bricks) 495
70 Dismantling of reinforced concrete partitions up to 8 cm thick 2 420
71 Dismantling of reinforced concrete partitions up to 16cm thick 3 795
72 Dismantling of walls made of foam blocks, plasterboard, wood 350
73 Dismantling of partitions of gypsum concrete 450
74 Foam walls made of foam blocks 540
75 Masonry of curved partitions of foam blocks 740
76 Bricklaying of brick walls( 1/2 bricks) 665
77 masonry bricks in walls 970
78 masonry partitions complex shapes of bricks 1 150
79 device opening in the concrete wall 4 235
80 device opening in the brick wall( 1/2 brick) 2 365
81 device opening in the brick wall 3 025
82 opening device inwall of foam blocks 1 540
83 Waterproofing of walls 190
84 Installation of plasterboard partitions in 1 layer 540
85 Installation of plasterboard partitions in 2 layers 670
86 Wall covering with gypsum plasterboard in 1 layer on metaThe frame with the installation of the noiseanet 420
87 walls in plasterboard layer 2 on the metal with mounting shumaneta 490
88 apparatus duct plasterboard rm 550
89 Bonding joints serpyanku rm 45
90 sheathing wall lining on the frame 500
91 sheathing plastic wall panels to the chassis 430
92 Warmingwalls with mineral slabs, foam plastic 150
93 Sound insulation of walls 550
94 Mounting of mesh net 90
95 Screening of walls with glass wool 150
96 Wall priming with concrete contact 75
97 Installation plaster beacons rm apparatus 80
98 metallic reinforcing mesh 120
99 wall plastering to 20mm 600
100 plastering walls from 20mm to 50mm 650
101 walls acrylic primer Primer 3 cycles 135
102 Primer walls acrylic primer cycle 4 180
103 Installation of paint angles PM 60
104 Wall plastering 1 cycle 295
105 Wall plastering 2 cycles 450
106 Wall grinding 1 cycle 70
107 Wall grinding 2 cycles 140
108 Proclayu p walls with glass 230
109 putty walls finish 1 cycle 210
110 Caulking wall finishing 2 cycles 350
111 Paint walls( 2 layers) 245
112 Application plaster 1 100
113 glue walls vinyl wallpaper without matching pattern 220
114 glue walls vinylwall paper with the selection of pattern 280
115 Wall gluing with non-woven wallpaper without drawing a selection 300
116 Wall gluing with non-woven wallpaper with the selection of pattern 350
117 Wall gluing with textile wallpaper 750
118 Wall gluing 1 000
119 Wallpapering of wallpaper curb PM 130
120 Wall cladding with ceramic tiles of one pattern 100 × 100 970
121 Wall tiling with ceramic tiles of one pattern 200 × 200 850
122 Wall tiling with ceramic tilesone figure 200 × 300 825
123 Cladding of the walls of the keram.tiles of one drawing of different sizes 1 000
124 Laying mosaic on finished surface( price from) 1 300
125 Installing panels from tiles on the wall 1 500
126 Tiling the tiles under 45 degrees lm 495
127 Installing ceramic curbs lm 250
128 Installing decorative corners lm 100
129 Decoration of decorative stone 825
130 Grouting( mosaic) 250
131 Grouting of tiles 180
132 Priming of slopes with concrete contact lm 75
133 Plastering of slopes lm 540
134 Primer from3-cycle washers lm 120
135 Primer for slopes 4 cycles lm 160
136 Filler for slopes lm 300
137 Grinding of slopes lm 70
138 Sticking of slopes with fiberglass lm 230
139 Putty finishing slopes 2 cycles lm 350
140 Paintingslopes( 2 layers) PM 260
141 Installation of the ventilation grille unit. 250
3. Ceilings
142 Removal of old wallpaper of 1st layer 90
143 Cleaning of ceiling for water-based paints 190
144 Cleaning of ceilings from non-aqueous paints 310
145 Cleaning of ceilings from putty 190
146 Cleaning the ceiling of foam tiles 250
147 Removing the rack ceiling bath. 250
148 Dismantling of stucco and ceiling cornices lm 250
149 Dismantling of ceiling cornices of PVC lm 150
150 Removing of plaster 240
151 Dismantling of ceiling from GKL to 1 level 140
152 Dismantling of ceiling from GKL to 2 levels 210
153 Fixing and sealingcracks lm 120
154 Ceiling waterproofing device 250
155 Arrangement of gypsum board lm 750
156 False ceiling installation from GKL in one layer 445
157 False ceiling arrangement in two layers GKL Montalevel ceiling from GKL 660
159 2-level ceiling device for complex geometric shapes 750
160 2-level ceiling device with built-in interior lighting 825
161 2-level ceiling device simple geometrical shape 660
162 Sawing laminates md 45
163 Devicemirror false ceiling from 10 m². 725
164 The device is a rack ceiling bath. 880
165 Suspended ceiling type Armstrong 250
166 Insulation of the ceiling with mineral slabs, polystyrene 200
167 Ceiling lining on a frame 545
168 Covering the ceiling with plastic panels on the frame 460
169 Installing the tension ceilings on a turn-key basis( price from) 650
170 Installation of plaster beacons lm 95
171 Arrangement of metal reinforcing mesh 110
172 Ceiling priming with concrete contact 75
173 Plastering ceiling to 20mm 630
174 Plastervanie ceiling ot20mm to 50mm 670
175 ceiling acrylic primer 3 cycles 135
176 m² ceiling acrylic primer Primer 4 cycles 180
177 painting installation angles rm 75
178 putty ceiling 1 cycle 360
179 putty ceiling 2 cycles 500
180 Grinding ceiling 1 cycle m² ceiling Grinding 90
181 2 cycles 180
182 Fixing of the ceiling with fiberglass 280
183 Ceiling putty finishing 2 cycles 380
184 Putty, grinding of curved ceiling elements PM 620
185 Silk screening curvilinearceiling elements. lm 250
186 Ceiling painting( 2 layers) 280
187 Ceiling with vinyl wallpaper without drawing a selection 280
188 Ceiling wallpapering for painting 300
189 Ceiling wallpapering with vinyl wallpaper 360
190 Ceiling wallpaper with non-woven wallpaper without drawing a selection 370
191 Ceiling flocking with fleece wallpaper 420
192 Ceiling with textile wallpaper 900
193 Mounting, stretching and puttying of gypsum stucco around the perimeter( price from) PM 500
194 installation, plastering of polyurethane foam ceiling cornices lm 290
195 Painting of polyurethane foam ceiling cornices 2 cycles lm 100
4. Electrical works
196 Dismantling of electrical wiring lm 40
197 Dismantling of spotlights, sockets, switches unit. 60
198 Cover plate for sockets, switches pcs. 170
199 Dismantle the chandelier( price from) unit. 150
200 Dismantle the power shield unit. 420
201 Throwing concrete under wiring 20x40mm. lm 240
202 Structuring of brick for electrical wiring 20x40mm. PM 180
203 Stuccoing gypsum for wiring 20x40mm. lm 120
204 Fixing the slab lm 170
205 Holes in the concrete 25mm. unit 240
206 Holes in the brick 25mm. unit 120
207 Laying of power cable up to 6 mm.kv. PM 90
208 Laying of a low-current cable PM 45
209 Installation of a box unit. 180
210 Installation of the transformer( 12V) unit. 240
211 Installation of trays PM 320
212 Mounting of electric box with section up to 50х50mm. lm 100
213 Assembly of electric scrapers with section up to 200х50mm. PM 200
214 Installation of internal panel for 24 modules( concrete) unit. 4 235
215 Installation of the inner panel for 24 modules( brick) unit. 3 025
216 Installation of the low-current shield unit. 1 210
217 Assembling the power shield( price from) unit. 5 000
218 Installation of the outer shield unit. 1 815
219 Laying of the heating element for the heated floor 800
220 Connection and installation of the rheostat for underfloor heating unit. 400
221 Installation of podzroetnikov in concrete unit. 230
222 Installation of podrozetnikov in brick, gypsum unit. 180
223 Installation of electrical socket, switch unit. 380
224 Setting of the call. 350
225 Installation of video intercom unit. 550
226 Connection of an electric heated towel rail unit. 1 870
227 Connecting and installing the fan. 485
228 Installation of spotlights unit. 370
229 Bra installation unit 450
230 Installation of ceiling light unit. 550
231 Installation of a hook for a chandelier / lamp unit. 180
232 Installation of chandelier 3-horn diameter up to 50 cm unit. 500
233 Installation of chandelier 3-horn diameter from 50 cm unit. 700
234 Installation of a chandelier 5-horn diameter up to 50 cm unit. 650
235 Installation of chandelier 5-horn diameter from 50 cm unit. 850
5. Plumbing works
236 Dismantling of PVC pipes PM 130
237 Dismantling of cast iron pipes PM 150
238 Dismantling of water pipes PM 130
239 Removing the bath unit. 1 700
240 Dismantling the kitchen sink unit. 420
241 Disassembly of the sink unit. 620
242 Dismounting the heated towel rail unit. 480
243 Dismantling the washing machine unit. 300
244 Dismantling of the "Moidodyr" unit. 330
245 Dismounting the shower cubicle unit. 900
246 Disassembly of toilet bowl, bidet unit. 550
247 Removing the radiator unit. 330
248 Removing the mixer unit. 190
249 Dismantling of the crane, filter, gearbox unit. 165
250 Structuring of brick for communications 50x70 lm 650
251 Morting of concrete for communication 50x70 lm 1 400
252 Fixing of slab lm 170
253 Laying of sewage pipes of PVC lm 210
254 Laying of pipes from metal plating dia to 32mm lm 290
255 Piping of polypropylene pipes PM 230
256 Piping of copper pipes PM 400
257 Connection of copper pipes by soldering pcs. 600
258 Fitting of copper fittings( angle, tee, cross, coupling, etc.) pcs. 350
259 Assembly of the comb. 960
260 Installation of filter, reducer unit. 960
261 Installation of cast iron baths / steel / acrylic units. 2 200
262 Shower enclosure installation with connection. 5 445
263 Installing the "moydodyra" unit. 1 650
264 Installation of a sink, tulip unit. 1 450
265 Installation of shower rod unit. 400
266 Installing the unit. 2 420
267 Toilet bowl or bidet installation unit 2 145
268 Installation of the heating radiator in its original location unit 650
269 Installation of a new radiator unit. 3 000
270 Installation of a heating radiator with re-insertion into the riser unit. 5 445
271 Installation of heated towel rail unit 2 500
272 Installing a storage heater type unit. 2 300
273 Installing the water heater unit. 1 650
274 Installation of accessories unit. 250
275 Connection of the washing machine unit. 1 400
276 Paint of heating pipes 2 cycles PM 70
6. Joinery
277 Dismantling of door leaf unit. 100
278 Removing the door unit unit. 275
279 Installation of the swing door unit unit. 1 900
280 Installation of a swinging door with hinges, locks with the installation of the door frame, with platbands and accessories set. 3 000
281 Installation of trims set. 990
282 Installation of compl. 1 100
283 Installation of the sliding door unit unit. 2 100
284 Installation of the sliding door unit of the two-fold unit. 2 700
285 Installation of double-leaf swing door unit. 2 200
286 Insertion of door hinges, locks with handles set. 600
287 Painting of windows 360
288 Painting of doors 420
7. Transport costs
289 Removal of construction waste bags unit. 80
290 Removing construction debris bags( floors without elevator) Building block 40
291 Construction materials skid t 1 500
292 Construction materials skid( floors without elevator) t floor 750
293 Removal of construction debris in containers of 8m3( with a cargo weight in a container up to 5 tons) CONT. 6 000
294 Removal of construction debris in containers 20m3( with a cargo weight in a container of up to 15 tons) Cont. 14 000
295 Removal of construction debris in containers of 27m3( with cargo weight in a container up to 26 tons) Cont. 18 000
296 Removal of construction debris in containers 32m3( with a cargo weight in a container up to 26 tons) Cont. 20 000
297 Delivery of building materials t 1 700

How to start the second stage of apartment repair - walls

The most significant element of the interior is the walls. It is they who are given the most attention, and, strangely enough, it is the repair work of the walls that consumes the whole stock of our time. Preparatory works are carried out in two stages - this is the removal of the old coating and the leveling of the walls.

There is no particular difference in the technology of removing the old coating from the ceiling or walls. The main thing is not to forget to call for help patience, because wallpaper, pasted in several layers, will have to soak and consistently rip off layer by layer.

To remove the old tile, which is most often located in the kitchen, in the bathroom and toilet room, you will need to equip yourself with a chisel, hammer or perforator.

Remember: an important part of any repair work is priming. After all, the primer and putty - this is the basis not only for finishing works, but also for the complex repair of the apartment. Its main function is to improve the adhesion of finishing materials to the wall, so the primer is made for finishing materials such as wallpaper, paint or plaster walls with gypsum.

Where to start? To perform the operation for leveling the walls you will need putty and plaster. Each toolkit is selected individually depending on the scale of the disaster: if irregularities( small dimples, cracks and potholes) do not reach a depth of more than 5 mm, then you can do shpaklevaniem, with a depth of defects more than 5 mm, use plaster.

Well, the finishing touch in such a complex operation is painting and wallpapering the prepared walls. Paper, textile, vinyl, metallized, cork, non-woven, soundproof wallpaper for children - it remains only to choose a new look for your cozy nest.

We hope now you do not ask yourself how to start repair work. You have the main stages of the work. As the site is filled with materials, you will have a complete guide to repairing the apartment, affecting all aspects, including interior design and selection of building materials and tools.