The amount of cement in one cube of concrete

click fraud protection

The amount of cement in one cube of concrete

In the construction of any facility, a cost estimate is drawn up, which reflects the need for materials, and in particular: how much cement is in 1 cube of concrete?

On the question of how much cement mortar is required for a particular construction, there is no clear and unambiguous answer.

To obtain accurate data, it is necessary to analyze the project documentation, and first of all, the working drawings.

The fact is that concrete concrete requires a certain amount of cement and inert materials - sand, gravel or gravel.

For the foundation, one brand of concrete is required, and for the construction of walls and partitions, another. The exact amount of materials that are necessary for construction is calculated by a certain method.

Contents:

  • Cement grades
  • Concrete grades
    • Concrete grade M200
    • Concrete grade M300
    • Concrete grade M400
  • Important conditions

Cement grades

Currently, the construction industry produces several cement grades that are used in capital construction, for finishing and repairing premises.

The most common brands that are used in all climatic zones, M300 and M400.

As a raw material for its production, limestone and clay are used, which are mixed and heated to a high temperature.

Table of consumption of cement As a result, this treatment produces a material called clinker. And after the next redistribution of clinker and various additives, cement is obtained.

When you add different ingredients, you get a certain quality material.

To ensure that the user can quickly and accurately navigate the names and technical characteristics of the material, a clear notation system is developed.

The following indices can be cited as an example:

  • B - solution hardening time;
  • PL - availability of plasticizers;
  • CC - sulfate-resistant additives are present;
  • H - cement based on clinker chips.

Some time ago the production of M100 and M200 ceased. This was due to their weak technical characteristics.

Today the most popular brands are the M400 and M500.In the individual housing construction, the M300 brand has proved itself well.

According to the current regulations and rules, the properties of cement are evaluated in two ways.

The first indicator is the ability to withstand the load. The second is the ratio of additives to the total volume of the material. So, the M400 withstands a load of 400 kg per cubic centimeter.

The amount of additives is indicated by the letter "D" and the number that indicates the percentage of the additive.

Here it must be said that the brand of concrete that is required for pouring a foundation or other element is determined by the cement brand.

And in one cube of concrete it can be a different amount.

In order to conduct accurate calculations, a special table has been developed that shows the proportions of all the materials in the concrete and how many of them.

Concrete grades

Before starting construction it is necessary to clearly understand how many cement bags are required for the whole object. In this case, you need to know how much of the binder goes to the cube of concrete.

The volume of sand and rubble should be determined more precisely, as these materials are worth the money. When performing calculations, it is necessary to take exact figures. The weight of one sack with cement can be 50 or 40 kg.

Video:

In the working drawings all concrete elements of the building are marked, from the foundation to the slabs. Getting to real calculations, you need to use this data.

All formulas for calculation are simple and available for specialists with secondary special education.

Concrete grade M200

To determine how much cement is required to mix one cube of M200 concrete, you need to use the table given in the codes of rules.

In the old version of the code of rules were called SNiP.The table also shows data on how much rubble and sand are required. The data is based on one cube of the final product.

Specialists know that concrete of this brand can be kneaded using different binding material. In the event that the grade M400 is applied, the proportions of the concrete mixture will be 1: 2.5: 4.2.

The first position is cement, then sand and gravel.

The same cube of concrete mixed with M500 cement will have other proportions - 1: 3.2: 4.9.Sand and rubble in this version will require more, and cement is less.

It can be said in another way, the same amount of cement binds a much larger volume of rubble and sand. Having initial data, it is necessary to calculate and weigh several options.

For foundation laying, there is no particular need to use a high-grade binder. It is necessary to ensure its sufficient strength and durability.

Therefore, all the solutions that are prescribed in the project documentation, you need to perform, despite the desire to save money.

Concrete grade M300

The concrete grade M300 is often used in individual construction. When using cement M400, the proportions of the concrete mixture should be the following - 1: 1,7: 3,2.

The strength characteristics of this brand of concrete are higher than those of the previous one. A binder is consumed more. Sand and gravel in the specific volume is used less.

Cement consumption per cube of concrete

When preparatory work is being carried out, serious attention must be paid to the quality of inert materials. The sand should not contain river mud or clay.

Similarly, the rubble must meet certain standards, which are dictated by the SNiP.

Concrete grade M300 can be kneaded from cement grade M500.In this case, it will be characterized by increased strength and resistance to loads. And the proportions per cube of concrete will be the same - 1: 2.2: 3.7.

If necessary, volumetric units of measurement can be changed to weight units. And then instead of cubes it will be possible to operate with tons or sacks.

When constructing small objects it is easier to calculate the number of bags than to calculate how much a kilogram of cement is in the cube. All the subtleties of this kind must be taken into account and applied in the compilation of the cost estimate.

Video:

Concrete grade M400

Experienced builders know that the less cement in a concrete solution, the lower the foundation's reliability. Concrete mix of M400 grade can be made of the same cement.

The proportions in this case will be as follows: 1: 1.1: 2.4.It should be recalled that in these proportions, cement, sand and gravel are taken. If necessary, gravel can be replaced with gravel.

Technologists of the construction industry know that the error in mixing can lead to a decrease in the quality of the concrete mix.

Deficiency of cement will lead to the fact that literally a year later the concrete base or wall will begin to collapse.

If you use cement cement M500 for mixing concrete mix, then you must maintain the following proportions - 1: 1.4: 2.8.

In some instructions, it is recommended that the cement brand be half as high as the grout brand.

I must say that such accuracy, which is shown in the calculations, is very difficult to sustain in practice. All these formulas are designed to determine the amount of cement in one cube.

Knowing the volume of concrete structures, it is easy to calculate the necessary amount of cement for the entire construction. It is necessary to multiply this value by the volume of cement in one cube and the required result should be obtained.

IMPORTANT CONDITIONS

When calculating, you do not need to get carried away by counting the number of bags with cement, which is enough for all work. It is necessary to clearly represent what structures are used for concrete.

It is used for laying the foundation, for erecting walls, laying tracks, constructing ceilings, beams and columns. This list can be continued.

The manufacturer of the work requires one thing - he must understand that the number of concrete grades is determined by the number of objects.

Video:

And in each version the brand of concrete will be different. And cement bags will require a different amount.

Keep track of the need for bags conveniently and profitable. In some cases, one bag of cement, five bags of rubble and 3 bags of sand are taken.

Concrete mortar mixed in such proportions meets all requirements. And this is not the only "cunning", which is used by builders with extensive experience.

instagram viewer